13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSLB.8 Composite Processing Operations<strong>Permit</strong> No. 13120Expiration Date: September 12,2013Page 138 of291EU8.2<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong><strong>Agency</strong> Reg I, 9.03(3/11/99) Thisrequirement will besuperseded uponadoption of the3/25/04 version of Reg1, 9.03 into the SIP<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong><strong>Agency</strong> Reg. 1,9.03(3/25/04) (State Only).This requirement willbecome federallyenforceable uponadoption into the SIPand will replace the3//1/99 version of Reg1, 9.03Shall not emit air contaminants in excess of20% opacity for more than 3 minutes pet·hourII.A.I (c) FacilityInspectionsII.A.I(b)ComplaintResponseThesemonitoringmethodssupersede themonitoringmethod for thisrequirementlisted in I.A.IaboveEcologyMethod9A(SeeSectionVIII)WAC 173-400-040(1)(9/20/1993) Thisrequirement will besuperseded uponadoption ofthe2//0/05 version ofWAC 173-400-040(/)into the SIPWAC 173 -400-040( I)(2/10/05)(Stote Only).This requirement willbecome federallyenforceable uponadoption into the SIPand will replace the9120/1993 version ofWAC /73-400-040(/)Boeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!