13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

V. STANDARD TERMS AND CONDITIONS<strong>Permit</strong> No. 13120Expiration Date: September 12,2013Page 248 of2912. Specific(a) NESHAPFor the requirements of 40 CFR 63 Subparts DD, GG, and WWWW, Boeing shallretain at least two years of records on site. The remaining three years of data may beretained off site. Boeing shall kept records in hard copy or computer readable formincluding, but not limited to, paper, microfilm, on a computer, computer floppy disk,magnetic tape, or microfiche. [40 CFR 63.5920, 4/21103; 40 CFR 63.10(b)(I), 4/20106](b) Boilers(i) NSPSAll records required under 40 CFR 60.49b, as applicable, shall be maintained for aperiod of 2 years following the date of such record. [40 CFR 60.49b( 0), 11116/06](ii) <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Reg. I Section 12.03All records required under <strong>Puget</strong> SOlmd <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Regulation I Section 12.03shall be retained for at least 2 years, including copies of all reports submitted to the<strong>Agency</strong> and records of all repairs, adjustments, and maintenance performed on themonitoring system. All such data collected after October 1, 1998 shall be retained for atleast 5 years. [<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Regulation I Section 12.03(e), 9123104(State Only)](c) Reinforced Plastic Composites NESHAP RecordsBoeing shall keep the following records as applicable:• A copy of each notification and report submitted to comply with this subpart,including all documentation supporting any Initial Notification or Notification ofCompliance Status that Boeing submitted, according to the requirements in 40CFR 63.10(b)(2)(xiv).• Records of performance tests, design, and performance evaluations as per 40 CFR63.10(b)(2).Boeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October J 0, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!