13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSI.B.5 NON NSPS - Fuel Burning Equipment<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 121 of291EU 5,4 <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> It shall be unlawful for any person to II.A.2(e) Ash ASTM<strong>Agency</strong> Reg I: 9.08(a) cause or allow combustion of oil that Purchase D482-00A,(4114/94) This requirement exceeds any of the following maximum Specification Sulfurwill be superseded upon limits unless allowed by a <strong>Puget</strong> <strong>Sound</strong> ASTMadoption of the 3125104 Cleau <strong>Air</strong> <strong>Agency</strong> Order of Approval D3120-96,version of Reg 1, 9.08(a) issued under Reg I: 6.07: (Note: In the Halogensinto the SIP. 3125104 version of Reg. 1, 9.08(0), the EPAreference to Reg I: 6.07 is changed to<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong>SW846,Article 6.)<strong>Agency</strong> Reg I: 9.08(a)9076,(3125104) (State Only) This • Ash 0.1% PCB EPArequirement shall become • Sulfur, used oil 1.0%SW846,federally enforceable upon 8080,• Sulfur, fuel oil 2.00%adoption into the SIP andLead EPAwill replace the 4114194• Lead 100 ppm 600/4-81-version of Reg I: 9.08(a). • Arsenic 5 ppm 045,200.7• Cadmium2 ppmRCW 70.94.610 (1991)• Chromium10 ppmState Only• Total halogensI,UUU ppm• PCBs2ppm• Flash100 'FEU 5.5 <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> Develop and implement an O&M plan to n.B Operation<strong>Agency</strong> Reg I: 7.09(b) assure continuous compliance with <strong>Puget</strong> and(9/10/98) <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Regulations I, MaintenanceII, and III.(O&M) PlanRequirements.This monitoringmethodsupersedes themonitoringmethod for thisrequirementlisted in I.A.IIEU 5.6 Puge! <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> Maintain equipment in good working II.A.2(d)(iv)<strong>Agency</strong> Reg I: 9.20(a) order that has received an Order of Steam(6/9/88) Approval. GeneratingBoilersRCW 70.94.152(7) (1996)State onlyII.A.I(c)FacilityInspectionsBoeing-Everett <strong>Permit</strong>, issued September 12,2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!