13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

VIII APPENDIXES<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 290 of291EPA July 1.2001Method 2440 CFR Part 60,Appendix AEPA July I, 2001Method 26 A40 CFR Part 60,Appendix AEPA July 1,2001Method 2740 CFR Part 60,Appendix AEPA July I, 2001Method 31940 CFR Part 60,Appendix ADetermination of Volatile Matter Content,Water Content, Density, Volume Sol ids,and Weight Solids of Surface CoatingsDeterminations ofI-ICIDetermination of Vapor Tightness ofGasoline Delivery Tanle Using Pressure-Vacuum TestDetermination of Filtration Efficiency forPaint OversprayFor water-based and waterreducible coatings, vendorcertification or data will beused for determiningcompliance. For other VOCcontaining materials) vendorcertification or data will bethe primary means fordetermining compliance. IfMethod 24 is used forcoatings, grab samples willbe taken and the average ofall of a single type of coating(e.g., primer or topcoat),mixed and ready forapplication within the samecoating operation, will beused for determiningcompliance.I-hour tests.5-minute averaging period.None required.For <strong>Puget</strong> SOlmd <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Method 5, EPA Method 6, EPA Method 7, A, C and D, EPAMethod 24, EPA Method 26A and EPA Method 306 A and B, each test shall consist of threeseparate runs and compliance shall be determined from the arithmetic average of the three runs.In the event that a sample is accidentally lost or conditions occur in which one of the runs mustbe discontinued because of circmnstances beyond the operator's control, compliance may, uponEPA or <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> approval, be determined from the arithmetic average ofthe two other runs.Boeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10,2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!