13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMISSION UNIT SPECIFIC REQUIREMENTSLB.1 O. Motor Vehicle Fueling Operations<strong>Permit</strong> No. 13120Expiration Date: September 12,2013Page 162 of291EU 10.4 <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> Boeing shall not allow the transfer of gasoline 1l.A.2(d)(xii) Gasoline<strong>Air</strong> <strong>Agency</strong> Reg II: fi'om any storage tank into any motor vehicle fuel Station Stage 22.07(c) (12/9/99) tank (except motorcycles) unless: Inspection RequirementsThis requirement willReg. II, 2.07, (12/9/99)• The dispenser system is CARB Stage 2be superseded uponcertified,adoption of the9/27/07 version of • <strong>Operating</strong> instructions for Stage 2 equipmentReg. 112.07 into the to include warning against topping off, andSIP.Dept of Ecology's toll-free telephone numberfor complaints about the system, are posted,and• Stage 2 vapor recovery equipment shall bevisually inspected for equipment defects onceper week.II.A.2( c) Documentationon FileEU 10.5 <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> Develop and implement an Operation and ILB Operation and<strong>Air</strong> <strong>Agency</strong> Reg I: Maintenance Plan to assure continuous compliance Maintenance (O&M)7.09(b) (9/10/98) with <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Regulations I, Plan Requirements.II, and III.This monitoring methodsupersedes themonitoring method forthis requirement listed inI.A.llEU 10.6<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> Boeing must install a CARB-certified Stage 1<strong>Air</strong> <strong>Agency</strong> Reg II: vapor recovery system on any gasoline storageILA.2( c) Documentation2.07(c)(I)(A) & (B) tank with a rated capacity of more than 1000 on File(9/27/07) gallons.This requirement will The CARB-certified Stage 1 vapor recoverybecome federally system must be installed in accordance with theenforceable upon CARB executive order in effect on the date ofadoption into the SIP installation. Defects listed in Section 2.07(c)(3),and will replace the Table 1 (a) are evidence that the installed1219199 version of equipment is not operated or maintained inReg. 11: 2.07. accordance with this requirement.Boeing-Everett <strong>Permit</strong>, issued September 12, 2008,' Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!