V. STANDARD TERMS AND CONDITIONS<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 261 of291Periods of excess emissions are defined as:• All 6-minute periods during which opacity exceeds 20% except for one 6-minute period per hour of not morethan 27%; and• All 30-day periods during which NOx exceeds 0.10 IblMMBtu heat input for oil and 0.05 IblMMBtu heat inputfor natural gas.- .. ' .' .... . ." . .' ..On a separate page, describe any changes since last quarter in the compliance monitoring system, process or controls.I certify that the information contained in this report is true, accurate, and complete.Name: ----------------c---------------------Signature: ________________________________ _Title: _________________________________ ~Date:One Summary (and, if necessary, one Excess Emissions and Monitoring System) Report formshall be submitted for each pollutant monitored at each affected facility.• If the total duration of excess emissions for the reporting period is less than 1 % of the totaloperating time for the reporting period and CEMS downtime for the reporting period is lessthan 5% of the total operating time for the operating period, only the smnmary report formshall be submitted and the excess emission report described in 40 CPR 60. 7( c) does need notto be submitted.• If the total duration of excess emissions for the reporting period is 1 % or greater of the totaloperating time for the reporting period and CEMS downtime for the reporting period is 5% orgreater of the total operating time for the operating period, both the summary report form andthe excess emission report described in 40 CFR 60.7(c) shall be submitted.[40 CPR 60.7(c) & (d), 2112/1999;, 40 CPR 60.49b(h), 11116/06; 40 CPR 60.49b(w), 11116/06](b) NSPS NOx EmissionsWithin 30 days after the end of each month, Boeing shall report to the <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong><strong>Air</strong> <strong>Agency</strong> the following information for each operating day for Boilers No.4, No.5,and No. 6:1) Calendar dateBoeing-Everett <strong>Permit</strong>, issued September 12, 2008,' Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!