13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSLB.9 Abrasive Blasting Operations<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 159 of291EU9.5 RCW 70.94.152(7) 1996 (State Maintain equipment in good II.A.2(d)(v)Only) working order that has Cyclones,received an Order of Baghouses,Approval.VacuumProducers, andAbrasive BlastBoothsII.A.I (c) FacilityEU 9.6 WAC 173-460-060(6)(a) (8/2//98) Abrasive blasting shall be II.A. I (c) Facility(State Only) performed inside a booth or Inspectionshangar designed to captureEU9.7 WAC 173-460-060(6)(b) (8/21/98) Outdoor blasting of structures [[.A.I(d) Work(State Only) or items too large to be Practicereasonably handled indoors Inspectionshall employ controlmeasures such as curtailmentduring windy periods andenclosure ofthe area beingBU9.8 WAC 173-460-060(6)(c) (8/2l!98) Outdoor blasting shall be Il.A.I(d) Work(State Only) performed with either steel Practiceshot or an abrasive containing Inspectionless than one percent by masswhich would pass through aNo. 200 sieve.EU9.9 WAC 173-460-060(6)(d) (8/21/98) All abrasive blasting with U.A.I(c)(State Only) sand shall be performed Facilityinside a blasting booth or Inspectionscabinet.Boeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!