13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMISSION UNIT SPECIFIC REQUIREMENTSI.B. 4 NSPS - Fuel Burning Equipment<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 116 of291EU 4.74Order of ApprovalNo. 7438, Condition#14 (8/4/99)EU 4.75 PSD #92-05,Amendment 2Condition #8(6/22/99)EU 4.76 PSD #92-05,Amendment 2Condition # II(6/22/99)EU 4.77 PSD 92-05Amendment 2Condition 12(6/22/99)When fIring back-up fuel oil, Boeing shalloperate and maintain a monitoring system formeasuring excess oxygen in the exhaust gasstream, as an alternate means of demonstratingcompliance with 40 CFR 60.43b(f). WhenfIring back-up fuel oil, Boeing shall maintainexcess O 2 at or greater than 2% (6-minuteaverage), except during startup, shutdown, ormalfunctions of the boilers.Sampling ports and platforms must beprovided for each boiler. Ports must meetrequirements of 40 CFR 60, Appendix AMethod I. Other arrangements may beacceptable if approved in advance by Ecologyprior to installation. Adequate permanent andsafe access to the test ports must be provided.Boeing will develop and follow an operationand maintenance plan to implementprocedures and control methods described inthe PSD application. The plan will beavailable to the <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong><strong>Agency</strong> and Washington Department ofEcology within 90 days of startup.Any activity that is undertaken by Boeing orothers, in a manner that is inconsistent with thePSD application, shall be subject to Ecologyenforcement under applicable regulations.Nothing in the PSD Approval shall beconstrued so as to relieve Boeing of itsobligations under any state, local, or federallaws or regulations.II.A.2(r)ContinuousEmissionMonitoringSystemNMRII.B OperationandMaintenance(O&M) PlanRequirements.NMREU 4.78<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong><strong>Air</strong> <strong>Agency</strong> Reg I:6.11 (9/26/02) StateOnlyAdopts 40 CFR 60 and Appendices in effect asofJuly 1,2005.II.BOperationandMaintenance(O&M) PlanRequirementsBoeing-Everett <strong>Permit</strong>, iS8uedSeptember 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!