13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSI.B. 4 NSPS - Fuel Burning Equipment<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 102 of291EU 4.40 60.46b(d)(7) To determine compliance with the opacity II.A.2(m) EPA Method(2/27/06) limits under 40 CFR 60.43b, the facility shall Performance 9 (See 40conduct an initial performance test as required Source Test CFR Part 60Appendix A)under 40 CFR 60.S, V,N.2 Emission Testing.July I, 2001)New Source Performance Tests, using Method9.EU 4.41 40 CFR 60.46b( c), To determine compliance with the nitrogen NMR60.46b(e)(4) oxide emission limits under 40 CFR 60.44b(2/27/06) (EU 4.36), the facility shall conduct theperformance test as required under 40 CFR60,S using the continuous system formonitoring nitrogen oxides under 40 CFR60.4S(b) (EU 4.43 ·EU 4.4S).During periods when performance tests are notrequested, nitrogen oxides emissions datacollected pursuant to 40 CFR 60.4Sb(g)(I) or40 CFR 60.4Sb(g)(2) are used to calculate a30·day "olling average emission rate on a dailybasis and used to prepare excess emissionreports, but will not be used to determinecompliance with the nitrogen oxides emissionstandards. A new 30·day rolling averageemission rate is calculated each steamgenerating unit operating day as the average ofall of the hourly nitrogen oxides emission datafor the preceding 30 steam generating unitoperating days.EU 4.42 40 CFR 60.47b(f) Facilities that combust very low sulfur oil are II.A.2(f) Fuel(2/27/06) not subject to the emission monitoring Oil Sulfurrequirements of 40 CFR 60.47b if the facility Contentobtains fuel receipts as per 40 CFR 60.49b(r). MonitoringProcedureBoeing-Everett <strong>Permit</strong>, issued September 12, 2008,' Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!