13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSLBJ Coating, <strong>Clean</strong>ing, and Depainting Operations<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 48 of291EU 3. 80WAC 173-401-650(a)(1114/93)Boeing shall, contemporaneously with making achange from one operating scenario to another, recordin a log at the permitted facility a record of thescenario under which it is operating.II.A.2(1)AerospaceNESHAPDepaintingMonitoringandRecordkeepingProcedureEU 3. 8140 CFR63.746(a)(1)(9/1/98)40 CFR 63.746, EU 3. 81 to EU 3. 86, applies todepainting of outer surface areas of completedaerospace vehicles. Does not apply to the depaintingof parts or units normally removed from the aerospacevehicle for depainting. Wings and stabilizers arealways subject to the requirements of this sectionregardless of whether their removal is considerednormal practice for depainting.NMREU 3.8240 CFR63.746(a)(2)(9/1/98)Aerospace vehicles or components that are intendedfor public display, no longer in operation, and noteasily capable of being moved are exempt from therequirements of this section.NMREU 3.8340CFR63.746(a)(3)(9/1/98)The following depainting operations are exempt fromthe requirements of 40 CFR 63.746, EU 3.81 to EU 3.86:(i) depainting ofradomes, and(ii) depainting of parts, subassemblies, .nd assembliesnormally removed from the primary aircraft structurebefore dep.inting.NMRBoeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October J 0, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!