13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Permit</strong> No. 13120EMISSION UNIT SPECIFIC REQUIREMENTS Expiration Date: September 12,2013LB.7 Cyclones, Baghouses, and Other Particulate Control Operations Page 134 of291EU7.6Order of Approval No. 5868, Condition#4 (4/17/95)A gauge to indicate thestatic pressuredifferential across thefilters will be installedand maintained for thedust collector. Thecontrol panel willindicate whether the dustcollector is operatingwithin its acceptablepressure drop range.II.A.2(d)(v)Cyclones,Baghouses,Vacuum Producers,and Abrasive BlastBoothsEU7.7Order of Approval No. 6582, Condition#4. (7/3/96)A gauge to measure thepressure drop across thebag separator will beinstalled and maintained.Within 90 days afterbeginning operation, theacceptable range for thegauge shall be clearlymarked on or near thegauge.Il.A.2(d)(v)Cyclones,Baghouses,Vacuum Producers,and Abrasive BlastBoothsEU 7.8Order of Approval No. 6582, Condition#5. (7/3/96)There shall be no visibleemissions fi'om thevacuum system.~~~~Il.A.2(d)(vi)OpacityMonitoring for NoVisible EmissionsBoeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!