13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EMISSION UNIT SPECIFIC REQUIREMENTSI.B.3 Coating, <strong>Clean</strong>ing, and Depainting Operations<strong>Permit</strong> No. 13120Expiration Date: September 12,2013Page 18 of2913. Coating, <strong>Clean</strong>ing, and Depainting OperationsDESCRIPTION: This section includes all activities and equipment associated with surfacecoating, cleaning, and depainting operations that have specific applicablerequirements other than the general requirements in Section LAoTheseoperations include coating mixing, application, drying, and curing; spray guncleaning; solvent wipe and solvent flush cleaning; de painting; and materialand waste handling.Examples of equipment involved in these activitiesinclude spray booths, paint hangars, solvent cleaning benches, and guncleaning units. Note that small buckets, pails, and beakers with a capacity of2 gallons or less usedfor cleaning with acetone are exempt from WAC 173-460-060(5). I In addition, cold solvent cleaners using solvents that meet thevolatility thresholds in <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Regulation I Section6.03(c)(53) are exempt from WAC 173-460-060 since they are exempt fromreview under <strong>Agency</strong> Regulation 1 Section 6.03.(WAC 173-460 is asupplemental regulation which does not apply to units that are exempt fromreview under <strong>Agency</strong> Regulation I Section 6.03).2<strong>Clean</strong>ing, primer application, and topcoat application operations su~ject tothe Aerospace NESHAP (40 CFR Part 63 Subpart GG) are included in thissection. Currently, the Everett facility depaints 6 or less completed aircrqfieach calendar year. Therefore, the de painting requirements of the AerospaceNESHAP do not apply to the facility. However, under the Alternate <strong>Operating</strong>Scenario shown below, the Everett facility would depaint more than 6completed aircraft in a calendar year and thus be subject to the depaintingrequirements. Chemical milling maskant application operations subject to theAerospace NESHAP are not conducted at the Everett facility and, therefore,are not included in this section.I August 10, 19991eller from David Kircher, <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong>, to Charles Austin, Boeing.2 February 24,2005 email/rom Steve Van Slyke, <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong>, to John Fosberg, Boeing.Boeing-Everett <strong>Permit</strong>, issued September 12, 2008,' Administrative Amendment 3: October 10, 20 J 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!