13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSLBJ Coating, <strong>Clean</strong>ing, and Depainting Operations<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 82 of 291EU 3. 186 Order of Boeing Everett shall install a two-stage filter system II.A.2( d)(ii)Approval No. consisting of a Kraft media filter such as the Spray Booths8315 (3) Columbus Industries Overspray Collector, followed by and Other(1217100) a pleated 25 to 30% ASHRAE efficiency filter, such Particulateas a Purolator Mark 80 filter, or a filter system with an Controlequivalent particulate removal efficiency.BoothsEU 3. 187 Order of The spray coating area shall be inspected at least once II.A.2( d)(ii)Approval No. per month of operation for proper seating of the Spray Booths8315 (4) filters, complete coverage over the exhaust plenum, and Other(1217100) and pressure drop across the filters. Boeing Everett Particulateshall record if the filters were properly seated, if the Controlcoverage of the exhaust plenum was complete, and the Boothspressure drop.EU3.188 Order of If improperly seated filters, incomplete coverage over II.B OperationApproval No. the exhaust plenum, or abnormal pressure drop are and8315(5) observed, Boeing Everett shall take corrective action, Maintenance(1217100) as specified in the facility's Operation and (O&M) PlanMaintenance Plan.Requirements.8603 permit.Boeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!