13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

V. STANDARD TERMS AND CONDITIONS<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 241 of291L. Compliance requirements1. Boeing shall continue to comply with all applicable requirements with which the source iscUlTently in compliance. Boeing shall meet on a timely basis any applicable requirementsthat become effective during the permit term. [WAC 173-401-630(3), 1114/93; WAC173-401-510(2)(h)(iii), 6/17/94]2. For the applicable requirements with which Boeing is not currently in compliance,Boeing shall comply with the elements of the compliance schedule established pursuantto WAC 173-401-630(3).M. Compliance certificationsBoeing shall submit a certification of compliance with permit terms and conditions once peryear, except the first such certification shall cover the period from permit issuance toDecember 31. Each certification shall include:1. The identification of each term or condition of the permit that is the basis of thecertification;2. The compliance status;3. Whether compliance was continuous or intermittent; and4. The method(s) used for determining the compliance status of the source, currently andover the reporting period. These methods must be consistent with the permit Monitoring,Maintenance and Recordkeeping Methods.All compliance certifications shall be submitted to EPA Region 10 and to the <strong>Puget</strong> <strong>Sound</strong><strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong>, at the following addresses, by Febmary 28 for the previous calendar year:<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong>Attn.: <strong>Operating</strong> <strong>Permit</strong> Certification1904 3rd Ave, Suite 105Seattle, Washington 98101EPA Region 10, Mail Stop OAQ-l 07Attn.: <strong>Air</strong> <strong>Operating</strong> <strong>Permit</strong>s1200 Sixth AvenueSeattle, Washington 98101[WAC 173-401-630(5), 1114/93]Boeing-Everett <strong>Permit</strong>, issued September J 2, 2008,' Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!