13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSLB. 4 NSPS - Fuel Burning Equipment<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 105 of291EU 4.49 40 CFR 60.48b(j) Units that burn only oil that contains no more II.A.2(t) Fuel(2/27/06) than 0.3 weight percent sulfur or liquid or Oil Sulfurgaseous fuels with potential sulfur dioxide Contentemission rates of 140 ng/J (0.32 Ib/MMBtu) Monitoringheat input 01' less are not required to conduct ProcedurePM emissions monitoring if they maintain fuelsupplier certifications of the sulfur content ofthe fuels burned.EU 4.50 40 CFR 60.49b(d) Boeing shall record and maintain records of ll.A.2(c)(11/16/06) the amounts of each fuel combusted during Documentationeach day and calculate the annual capacity on Filefactor individually for oil and natural gas foreach calendar quarter. The annual capacityfactor is determined on a 12-month rollingaverage basis with a new annual capacityfactor calculated at the end of each calendarmonth.EU 4.51 40 CFR 60.49b(f) For facilities subject to the opacity standard 1l.A.2(c)(11/16/06) under 40 CFR 60.43b. the owner or operator Documentationshall maintain records of opacity. See EU on File4.43 for alternate opacity monitoring.Boeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!