13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

EMISSION UNIT SPECIFIC REQUIREMENTSLB. 1 O. Motor Vehicle Fueling Operations<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 160 of29110. Motor Vehicle Fueling OperationsDESCRIPTION:This section consists of all activities and equipment associated withmotor vehicle fueling operations, including fuel receiving, fuelstorage, fuel dispensing, and material and waste handling that havespecific applicable requirements other than the general requirementsin Section LAoThe gasoline station at the facility consists of a gasoline pump, adiesel pump, and two 15,000 gallon underground storage tanks forgasoline and diesel. Gasoline throughput at the station is currentlyless than 200,000 gallons annually. However, throughput couldexceed 200,000 gallyr in the foture. Therefore, regulatoryrequirements for both scenarios have been includedThe table below does not necessarily include all units that may besubject to the requirements of this section; units that have not receivedan Order of Approval or were not previously registered with the <strong>Puget</strong><strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> are not included in the table.Bldg.Location.40-10 East sideOrder of InstallMSSIID# Approval # Date Source Description4020051B376 8330 12/00 Gasoline stationData in italics are for information only and are not enforceable conditions of this permit.Boeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!