EMISSION UNIT SPECIFIC REQUIREMENTSLB.8 Composite Processing Operations<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 136 of2918. Composite Processing OperationsDESCRIPTION:This section includes all activities and equipment associated withcomposite processing operations that have specific applicablerequirements other than the general requirements in Section LA.The requirements of the Reinforce Plastic Composites NESHAP (40CFR 63 Subpart WWWW) are also included in this section. Currently,the only operations at Boeing Everett that are subject to theReinforced Plastic Composites NESHAP are open and closed moldingoperations and any associated cleaning, mixing, material storage andrepair operations.The table below does not necessarily include all units that may besubject to the requirements of this section; units that have not receivedan Order of Approval or were not previously registered with the <strong>Puget</strong><strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> are not included in the table.Order ofInstallBldg.CoUDr.MSSlfD# Approval # Date Source Description40-56 CC-440-56 CC-340-56 CC-540-56 CC-640-56 BB-640-56 BB-6.840-56 BB-7.240-56 BB-7.840-56 BB-8.240-56 K-2.540-56 H-740-56 0-1381107 2084 1500 Ton Press #2104423 3447 1500 Ton Press #1104424 3447 1500 Ton Press #6107150 3447 1500 Ton Press #7107210 3747 f 200 Ton Press #8126292 3953 1000 Ton Press # f N126288 3954 f 000 Ton Press #2N126280 3955 1000 Ton Press #3N126284 3956 1000 Ton Press #4N027586 3980 200 Ton Perforating Press144782 4015 Multi-opening press144783 4016 Multi-opening pressData in italics are for iriformation only and are not enforceable conditions of this permit.Boeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!