13.07.2015 Views

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

Air Operating Permit - Puget Sound Clean Air Agency

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

V. STANDARD TERMS AND CONDITIONS<strong>Permit</strong> No. 13120Expiration Date: September 12, 2013Page 267 of2918. Regulation I, Article 12Boeing shall submit a monthly report to <strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> within 30 days afterthe end of the month in which the data were recorded. This report shall include:• The date, time period, magnitude (in the units of the standard) and cause of each emissionthat exceeded an applicable emission standard;• The date and time of all actions taken to correct the problem, including any actions takento minimize the emissions during the exceedance and any actions taken to prevent itsrecurrence;• The number of hours that the equipment (required to be monitored) operated each monthand the number of valid hours of monitoring data that the monitoring system recoveredeach month;• The date, time period, and cause of each failure to meet the data recovery requirements ofSection 12.03(b) and any actions taken to insure adequate collection of such data;• The date, time period, and cause of each failure to recover valid hourly monitoring datafor at least 90% of the hours that the equipment (required to be monitored) was operatedeach day;• The results of all cylinder gas audits conducted during the month; and• A certification of truth, accuracy, and completeness signed by an authorizedrepresentative ofthe owner or operator.[<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Reg I: 12.03, 4/9/1998, Order of Approval No. 7438Condition 4, 8/4/99] [<strong>Puget</strong> <strong>Sound</strong> <strong>Clean</strong> <strong>Air</strong> <strong>Agency</strong> Reg I: 12.03,9123104, State Only]9. Summary of Required Applications, Reports, and ComplianceCertificationsThe following table contains a summary of the applications, reports and compliancecertifications to be submitted pursuant to this permit, as applicable. In the event of a conflictbetween the reporting requirements listed below and the reporting requirements listed in otherBoeing-Everett <strong>Permit</strong>, issued September 12, 2008; Administrative Amendment 3: October 10, 2012

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!