Chapter 2 - P rogramme 1 - Department of Defence
Chapter 2 - P rogramme 1 - Department of Defence
Chapter 2 - P rogramme 1 - Department of Defence
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
| <strong>Chapter</strong> 3 - P<strong>rogramme</strong> 8: Force Employment |<br />
Additional Funding<br />
Annual Report FY 2007 - 2008 100<br />
| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />
Details <strong>of</strong> outputs <strong>of</strong> specific policy options where additional funds were allocated for FY 2007/08 are<br />
reflected in Table 3.4.<br />
Table 3.4 Outputs <strong>of</strong> Specific Policy Options Where Additional Funds Were Allocated for FY<br />
2007/08<br />
Policy Option Allocations (R’000) Output Targets Actual Achievement<br />
Madimbo Training Area 1 000 Hiring <strong>of</strong> training area Funds not utilised due to the<br />
fact that the land restitution<br />
claim is not yet resolved.<br />
Recruiting, equipment and<br />
6 365 Specialist training and testing Funds utilised according to<br />
dynamic testing<br />
<strong>of</strong> ammunition<br />
plan.<br />
Barracuda boat system 4 000 Replacement <strong>of</strong> Barracuda<br />
boat system<br />
Performance and Service Delivery Improvemet<br />
Funds utilised according to<br />
plan.<br />
Details <strong>of</strong> performance and service delivery improvement for FY 2007/08 are reflected in Table 3.5.<br />
Table 3.5 Performance and Service Delivery Improvement for FY 2007/08<br />
Activities<br />
Closing down <strong>of</strong> 14<br />
dormant units<br />
Self-auditing and selfevaluation<br />
system with<br />
rectification actions<br />
Revisiting <strong>of</strong> structure as<br />
part <strong>of</strong> DODW process<br />
DEFCOM agreements<br />
resulting in unscheduled<br />
multinational exercises<br />
and exercises not<br />
supporting own JFE<br />
goals<br />
Planned Management<br />
Intervention<br />
Quarterly progress<br />
reports<br />
Generic system<br />
developed and<br />
distribution with followup<br />
evaluations<br />
Participation in projects<br />
with DIMS assistance<br />
Anticipated Benefit Status Actual Achievement<br />
Reduction in unnecessary<br />
running costs<br />
Enhanced efficiency,<br />
accountability and<br />
productivity<br />
Streamlined structures<br />
for better integration<br />
with levels 2 and 4<br />
DEFCOM management Increased efficiency<br />
with regard to budget<br />
procedures<br />
Increased efficiency with<br />
regard to alignment with<br />
JFE goals<br />
Services Scaled Down, Suspended or Abolished<br />
Ongoing Final audit by Inspector-<br />
General <strong>of</strong> the DOD to be<br />
completed.<br />
Ongoing 25% (system developed and<br />
distributed, all roleplayers busy<br />
with self-audit)<br />
Delayed<br />
due to<br />
higherorder<br />
DODW<br />
process<br />
The structure is being revisited<br />
through Project KGOPOLO.<br />
Ongoing To be implemented. Close<br />
liaison between Joint<br />
Operations Division and<br />
<strong>Defence</strong> Foreign Relations<br />
Division takes place.<br />
Details <strong>of</strong> services scaled down, suspended or abolished during FY 2007/08 are reflected in Table 3.6.<br />
Table 3.6 Services Scaled Down, Suspended or Abolished During FY 2007/08<br />
Reduction in Output<br />
Gradual withdrawal from<br />
routine internal deployments<br />
with handing over <strong>of</strong><br />
borderline control to the SAPS<br />
Reason For Scaling down/<br />
Suspension/Abolishment<br />
Cabinet decision Reduction <strong>of</strong> SANDF force<br />
levels deployed internally<br />
Implications Actual Achievement<br />
The available force is decreasing<br />
on a continuous basis, in<br />
accordance with the agreed<br />
SANDF Exit and SAPS Entry<br />
Strategy between the SANDF<br />
and the SAPS.