17.12.2012 Views

Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

| <strong>Chapter</strong> 9 - P<strong>rogramme</strong> 7: Joint Support |<br />

Annual Report FY 2007 - 2008 172<br />

| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />

Table 9.5 Command and Management Information Service P<strong>rogramme</strong> Outputs <strong>of</strong> Specific Policy<br />

Options where Additional Funds were Allocated for FY 2007/08 (continued)<br />

Policy Option Allocations (R’000) Output Targets Actual Achievement<br />

Command and control 2 500 Upgrading <strong>of</strong> power- 100% achievement <strong>of</strong> targets<br />

generating equipment in accordance with project<br />

plans. Outputs as follows:<br />

• The design and<br />

manufacturing <strong>of</strong> new<br />

motors and alternators<br />

to extend the lifecycle<br />

<strong>of</strong> the existing fleet <strong>of</strong><br />

the 15 KVA and 50 KVA<br />

generators for the short<br />

to medium term.<br />

1 365 Satellite communication link 100% achievement <strong>of</strong> targets<br />

repair at Boekenhoutsklo<strong>of</strong> in accordance with project<br />

(damage was caused by a plans. Outputs as follows:<br />

lighting strike)<br />

• Repair <strong>of</strong> the satellite<br />

hub at Boekenhoutsklo<strong>of</strong><br />

that was struck by<br />

lightning. This provides<br />

communications to<br />

forces that are externally<br />

deployed.<br />

600 Frequency migration 100% achievement <strong>of</strong> targets<br />

according to the ICASA in accordance with project<br />

agreement<br />

plans. Outputs as follows:<br />

• The frequency migration<br />

in the 380-400 Mhz band<br />

according to ICASA<br />

regulations.<br />

Execution <strong>of</strong> <strong>Defence</strong> 29 000 Renewal <strong>of</strong> the DICI (i.e. 100% achievement <strong>of</strong> targets<br />

Information Communication<br />

DOD bandwidth management in accordance with project<br />

Infrastructure (DICI) projects<br />

s<strong>of</strong>tware, LAN/data and voice plans. Outputs as follows:<br />

cable reticulation)<br />

• The upgrade and<br />

replacement <strong>of</strong> the<br />

Central Server Backup<br />

Asset Management,<br />

upgrade <strong>of</strong> the DOD<br />

PABX infrastructure and<br />

microwave link upgrades.<br />

2.2 Ghz migration 35 000 Migration out <strong>of</strong> the 2.2 Ghz 91% achievement.<br />

frequency band<br />

Not all the equipment could<br />

be delivered by the foreign<br />

suppliers.<br />

Project will be completed<br />

by the end <strong>of</strong> FY 2008/09.<br />

The rest <strong>of</strong> the funds rolled<br />

over from FY 2007/08 will<br />

be expended before the end<br />

<strong>of</strong> the 2008/09 financial<br />

year, when the rest <strong>of</strong> the<br />

equipment is delivered.<br />

Command and Management Information Service P<strong>rogramme</strong>: Performance and Service Delivery<br />

Improvement<br />

Details <strong>of</strong> the Command and Management Information Service P<strong>rogramme</strong>’s performance and service<br />

delivery improvement for FY 2007/08 are reflected in Table 9.6.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!