17.12.2012 Views

Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Outputs<br />

| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />

Details <strong>of</strong> the Command and Management Information Service P<strong>rogramme</strong>’s outputs <strong>of</strong> specific policy<br />

options, where additional funds were allocated, are reflected in Table 9.5.<br />

Table 9.5 Command and Management Information Service P<strong>rogramme</strong> Outputs <strong>of</strong> Specific Policy<br />

Options where Additional Funds were Allocated for FY 2007/08<br />

Policy Option Allocations (R’000) Output Targets Actual Achievement<br />

Resourcing in support <strong>of</strong> the 18 000 Increasing <strong>of</strong> resources 100% achievement <strong>of</strong> targets<br />

rollout <strong>of</strong> the DEIS Master<br />

in accordance with project<br />

Plan (SLA 2.1)<br />

plans. Outputs as follows:<br />

• Integrated <strong>Defence</strong><br />

Enterprise Architecture<br />

(IDEA) toolset<br />

integration.<br />

• Activated Strategic Plan<br />

Enabler (SPE) and<br />

Activity-Based Planning<br />

Enabler (ABPE)<br />

enhancements.<br />

• Performance<br />

Management activated<br />

and implemented<br />

(Balanced Scorecard).<br />

• Bankserve (pay<br />

system) activation and<br />

implementation.<br />

• Health Informatics<br />

activation.<br />

• <strong>Department</strong><br />

Organisation Structural<br />

System (DOSS) technical<br />

preparation intervention.<br />

• <strong>Defence</strong> Telephone<br />

Network (DTN) upgrade.<br />

• Upgrade <strong>of</strong> DOD Band<br />

with Management System<br />

(BMS).<br />

• Upgrade <strong>of</strong> the DOD<br />

central server backup<br />

system.<br />

Execution <strong>of</strong> projects (SLA 3 556 Activation <strong>of</strong> projects (URS, 100% achievement <strong>of</strong> targets<br />

2.6: ICT Acquisition Services)<br />

pro<strong>of</strong> <strong>of</strong> concepts)<br />

in accordance with project<br />

plans. Outputs as follows:<br />

• Installation <strong>of</strong> a<br />

“pro<strong>of</strong> <strong>of</strong> concept”<br />

for Electronic Content<br />

Management (ECM).<br />

• Implementation <strong>of</strong> an<br />

active directory pilot site<br />

for the DOD.<br />

Command and control 5 000 Enhancement <strong>of</strong> C2 systems 100% achievement <strong>of</strong> targets<br />

(migration <strong>of</strong> the SANDF in accordance with project<br />

out <strong>of</strong> the 2.2 Ghz frequency plans. Outputs as follows:<br />

band 7.0)<br />

•<br />

Installation <strong>of</strong> microwave<br />

links for the migration<br />

<strong>of</strong> the 2,2 Ghz band<br />

in accordance with<br />

the Independent<br />

Communication<br />

Association <strong>of</strong> South<br />

Africa (ICASA)<br />

regulations.<br />

171 Annual Report FY 2007 - 2008<br />

| <strong>Chapter</strong> 9 - P<strong>rogramme</strong> 7: Joint Support |

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!