Activities<br />
Control system to<br />
confirm credibility <strong>of</strong><br />
HR planning by<br />
subordinate budget<br />
holders<br />
Control system to<br />
prevent overspending by<br />
budget holders on items<br />
such as S&T and leave<br />
Planned Management<br />
Interventions<br />
Increased focus on<br />
Item 10<br />
(personnel discretionary)<br />
management<br />
| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />
Table 4.4 Service Delivery Improvement for FY 2007/08 (continued)<br />
To implement capability<br />
management in the SA<br />
Army<br />
Engineer Capability<br />
To ensure SA Army<br />
facilities comply with<br />
OHS prescripts and<br />
to maintain SA Army<br />
facilities<br />
Map and implement a<br />
Capability Management<br />
Process<br />
Establish an SA Army<br />
capability to maintain SA<br />
Army facilities<br />
Anticipated Benefit Status Actual Achievement<br />
Reduction in double<br />
budgeting<br />
Control over<br />
discretionary funds, thus<br />
savings incurred<br />
No surplus HR funds at<br />
end <strong>of</strong> financial year; if<br />
any, they can be utilised<br />
in operating budget<br />
Integrated Capability<br />
Management that ensures<br />
development and<br />
maintenance in<br />
accordance with Army<br />
vision and required<br />
output<br />
Critical maintenance<br />
done under SA Army<br />
control<br />
Reduction in OHS risks<br />
Limited funds maximally<br />
utilised according to<br />
priorities<br />
Completed The SA Army overspent on its<br />
Item 10 budget.<br />
Annual change <strong>of</strong> MT/ST HR<br />
planning in terms <strong>of</strong>:<br />
• Implementation <strong>of</strong> DODI<br />
66/67;<br />
• Increased MSDS intake;<br />
• Approval for the<br />
implementation <strong>of</strong><br />
technical allowances;<br />
• Restriction <strong>of</strong> CSS<br />
transfers;<br />
• 2% salary increase for<br />
privates serving longer<br />
than eight years in the same<br />
rank; and<br />
• Increased utilisation <strong>of</strong><br />
Reserves.<br />
90,76% spending <strong>of</strong> the SA<br />
Army operating budget and<br />
99,82% commitment <strong>of</strong> the SA<br />
Army budget in the reporting<br />
period. This is through the SA<br />
Army Expenditure<br />
Coordinating Committee<br />
(AECC). The control measure<br />
contained the overexpenditure<br />
on IAE to a certain degree.<br />
Despite the above, the<br />
allocation for the Landward<br />
<strong>Defence</strong> P<strong>rogramme</strong> was fully<br />
(100%) expended.<br />
Partially Mapping <strong>of</strong> Capability<br />
achieved Management (Cap Mngnt)<br />
Process completed, including<br />
interface with SMP.<br />
Capability Management will be<br />
updated after external design<br />
review and ratified by DODI<br />
and JDP for PSM and Cap<br />
Mngnt.<br />
PSM/Cap Mngnt-accredited<br />
training baseline is in the<br />
process <strong>of</strong> development.<br />
It is more or less five months<br />
behind schedule due to capacity<br />
(knowledge base).<br />
In process The capability is not yet<br />
established. Lack <strong>of</strong><br />
resources and post baseline,<br />
as well as interface with DOD<br />
Works Regiment to be<br />
determined.<br />
115 Annual Report FY 2007 - 2008<br />
| <strong>Chapter</strong> 4 - P<strong>rogramme</strong> 2: Landward <strong>Defence</strong> |