Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />

Table 5.1 Air <strong>Defence</strong> P<strong>rogramme</strong> Outputs for FY 2007/08 (continued)<br />

Output Performance Measure Annual Target<br />

Subp<strong>rogramme</strong> Command and Control Capability<br />

Air defence management Number <strong>of</strong> mission-ready<br />

capability<br />

mission controllers<br />

Number <strong>of</strong> static control<br />

centres available<br />

Air traffic management<br />

capability<br />

Ground command and control<br />

management capability<br />

Information Communication<br />

Technology management<br />

capability<br />

Number <strong>of</strong> radar systems<br />

available<br />

Number <strong>of</strong> mission-ready air<br />

traffic controllers, air traffic<br />

service units and availability <strong>of</strong><br />

navigation aids<br />

Number <strong>of</strong> mission-ready<br />

command post <strong>of</strong>ficers and<br />

command post assistants<br />

Availability <strong>of</strong> ground<br />

command and control<br />

management system<br />

Personnel days for external<br />

ordered commitments<br />

Number <strong>of</strong> mission-ready<br />

telecommunication <strong>of</strong>ficers<br />

and operators<br />

Actual Achievement /<br />

Comments<br />

20 mission controllers 20 mission controllers<br />

available.<br />

Two static control centres 98% mission-readiness <strong>of</strong><br />

the two static control centres<br />

achieved as planned.<br />

10 radar systems 89% <strong>of</strong> 10 radar systems<br />

achieved. Major component<br />

failure on reserve tactical radar<br />

system. Long lead time for<br />

delivery <strong>of</strong> component from<br />

supplier. Insufficient funds<br />

available to carry enough<br />

spares to avoid the lead-time<br />

problems and ensure the<br />

required availability.<br />

49 air traffic controllers 43 air traffic controllers<br />

available. Shortfall due<br />

to recruiting by other<br />

organisations.<br />

Seven air traffic service units 88% achieved. Due to the<br />

upgrade <strong>of</strong> Swartkop airfield<br />

during the financial year,<br />

the set target could not be<br />

reached.<br />

Two mission-ready mobile 25% availability achieved. The<br />

towers<br />

towers were being refurbished<br />

and were therefore unavailable<br />

for long periods during the<br />

year.<br />

95% availability <strong>of</strong> navigation 97% availability achieved.<br />

aids<br />

Better serviceability achieved<br />

than planned for.<br />

38 command post <strong>of</strong>ficers 37 command post <strong>of</strong>ficers<br />

available. Target not achieved<br />

due to attrition <strong>of</strong> personnel.<br />

83 command post assistants 83 command post assistants<br />

available.<br />

95% 95% availability <strong>of</strong> ground<br />

command and control<br />

management achieved.<br />

1 460 personnel days 1 881 personnel days achieved.<br />

Planned days exceeded due to<br />

requirement for members to<br />

deploy to Sudan.<br />

26 telecommunication <strong>of</strong>ficers 19 telecommunication <strong>of</strong>ficers<br />

available. The transfer <strong>of</strong> the<br />

functions from DOD level<br />

to the Air Force took place,<br />

though the posts have not<br />

been transferred yet. Target<br />

not achieved due to attrition<br />

<strong>of</strong> personnel.<br />

153 telecommunication 94 telecommunication<br />

operators<br />

operators available. The<br />

transfer <strong>of</strong> the functions from<br />

DOD level to the Air Force<br />

took place, though the posts<br />

have not been transferred yet.<br />

Target not achieved due to<br />

attrition <strong>of</strong> personnel.<br />

123 Annual Report FY 2007 - 2008<br />

| <strong>Chapter</strong> 5 - P<strong>rogramme</strong> 3: Air <strong>Defence</strong> |