| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />
Table 5.1 Air <strong>Defence</strong> P<strong>rogramme</strong> Outputs for FY 2007/08 (continued)<br />
Output Performance Measure Annual Target<br />
Subp<strong>rogramme</strong> Command and Control Capability<br />
Air defence management Number <strong>of</strong> mission-ready<br />
capability<br />
mission controllers<br />
Number <strong>of</strong> static control<br />
centres available<br />
Air traffic management<br />
capability<br />
Ground command and control<br />
management capability<br />
Information Communication<br />
Technology management<br />
capability<br />
Number <strong>of</strong> radar systems<br />
available<br />
Number <strong>of</strong> mission-ready air<br />
traffic controllers, air traffic<br />
service units and availability <strong>of</strong><br />
navigation aids<br />
Number <strong>of</strong> mission-ready<br />
command post <strong>of</strong>ficers and<br />
command post assistants<br />
Availability <strong>of</strong> ground<br />
command and control<br />
management system<br />
Personnel days for external<br />
ordered commitments<br />
Number <strong>of</strong> mission-ready<br />
telecommunication <strong>of</strong>ficers<br />
and operators<br />
Actual Achievement /<br />
Comments<br />
20 mission controllers 20 mission controllers<br />
available.<br />
Two static control centres 98% mission-readiness <strong>of</strong><br />
the two static control centres<br />
achieved as planned.<br />
10 radar systems 89% <strong>of</strong> 10 radar systems<br />
achieved. Major component<br />
failure on reserve tactical radar<br />
system. Long lead time for<br />
delivery <strong>of</strong> component from<br />
supplier. Insufficient funds<br />
available to carry enough<br />
spares to avoid the lead-time<br />
problems and ensure the<br />
required availability.<br />
49 air traffic controllers 43 air traffic controllers<br />
available. Shortfall due<br />
to recruiting by other<br />
organisations.<br />
Seven air traffic service units 88% achieved. Due to the<br />
upgrade <strong>of</strong> Swartkop airfield<br />
during the financial year,<br />
the set target could not be<br />
reached.<br />
Two mission-ready mobile 25% availability achieved. The<br />
towers<br />
towers were being refurbished<br />
and were therefore unavailable<br />
for long periods during the<br />
year.<br />
95% availability <strong>of</strong> navigation 97% availability achieved.<br />
aids<br />
Better serviceability achieved<br />
than planned for.<br />
38 command post <strong>of</strong>ficers 37 command post <strong>of</strong>ficers<br />
available. Target not achieved<br />
due to attrition <strong>of</strong> personnel.<br />
83 command post assistants 83 command post assistants<br />
available.<br />
95% 95% availability <strong>of</strong> ground<br />
command and control<br />
management achieved.<br />
1 460 personnel days 1 881 personnel days achieved.<br />
Planned days exceeded due to<br />
requirement for members to<br />
deploy to Sudan.<br />
26 telecommunication <strong>of</strong>ficers 19 telecommunication <strong>of</strong>ficers<br />
available. The transfer <strong>of</strong> the<br />
functions from DOD level<br />
to the Air Force took place,<br />
though the posts have not<br />
been transferred yet. Target<br />
not achieved due to attrition<br />
<strong>of</strong> personnel.<br />
153 telecommunication 94 telecommunication<br />
operators<br />
operators available. The<br />
transfer <strong>of</strong> the functions from<br />
DOD level to the Air Force<br />
took place, though the posts<br />
have not been transferred yet.<br />
Target not achieved due to<br />
attrition <strong>of</strong> personnel.<br />
123 Annual Report FY 2007 - 2008<br />
| <strong>Chapter</strong> 5 - P<strong>rogramme</strong> 3: Air <strong>Defence</strong> |