17.12.2012 Views

Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

| <strong>Chapter</strong> 4 - P<strong>rogramme</strong> 2: Landward <strong>Defence</strong> |<br />

Annual Report FY 2007 - 2008 108<br />

| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />

Table 4.1 Landward <strong>Defence</strong> P<strong>rogramme</strong> Outputs for FY 2007/08 (continued)<br />

Output Performance Measure Target Actual Achievement<br />

Reserve core growth capability<br />

(Composite artillery capability)<br />

Air <strong>Defence</strong> Artillery Capability<br />

Training capability at School<br />

<strong>of</strong> Air <strong>Defence</strong> Artillery<br />

Regular core growth capability<br />

(Composite air defence<br />

artillery capability)<br />

Regular core growth capability<br />

(Mechanised air defence<br />

artillery capability)<br />

Reserves core growth<br />

capability<br />

(Mobile air defence artillery)<br />

Engineer Capability<br />

Training capability at the<br />

School <strong>of</strong> Engineers<br />

Number <strong>of</strong> units prepared<br />

according to force<br />

requirements<br />

Number <strong>of</strong> learners on air<br />

defence artillery courses<br />

Number <strong>of</strong> units prepared<br />

according to force<br />

requirements<br />

Number <strong>of</strong> units prepared<br />

according to force<br />

requirements<br />

Number <strong>of</strong> units prepared<br />

according to force<br />

requirements<br />

Number <strong>of</strong> learners on<br />

engineers courses<br />

2 x self-propelled GV 6 gun<br />

regiments<br />

2 x towed gun regiments<br />

1 x multiple rocket launcher<br />

regiment<br />

The Artillery Mobilisation<br />

Regiment was unfortunately<br />

never equipped to provide<br />

ready-to-issue Prime Mission<br />

Equipment to the School <strong>of</strong><br />

Artillery. The serviceability<br />

<strong>of</strong> the Prime Mission<br />

Equipment currently on the<br />

inventory with the Artillery<br />

Mobilisation Regiment<br />

hampered the outcome <strong>of</strong><br />

some <strong>of</strong> the courses presented<br />

at the School <strong>of</strong> Artillery.<br />

An example is Driving and<br />

Maintenance: the requirement<br />

to provide vehicles could not<br />

be met.<br />

620 learners on 32 courses 933 learners on 28 courses.<br />

4 x Regular courses cancelled.<br />

18 x additional informal<br />

courses presented in<br />

preparation for Phase 1<br />

commissioning <strong>of</strong> Ground-<br />

Based Air <strong>Defence</strong> System<br />

(GBADS).<br />

1 x air defence artillery<br />

regiment<br />

Leader group for battery, from<br />

3 x Reserves regiments as<br />

sources <strong>of</strong> manpower<br />

1 x air defence artillery<br />

regiment (Reserves)<br />

1 x air defence artillery<br />

regiment<br />

The capability was<br />

decommissioned or phased<br />

out. This is in accordance with<br />

the refined SA Army Plan<br />

FY 2007/08.<br />

80% provisioning <strong>of</strong> required<br />

units.<br />

HR: Insufficient leader group .<br />

HR: Insufficient ADA troops<br />

converted.<br />

Equipment: Insufficient<br />

product system technical<br />

support for PME.<br />

1 691 learners on 78 courses 972 learners on 71 courses.<br />

Eight in the process <strong>of</strong> being<br />

completed in April 2008.<br />

SA Army submitted Changes<br />

to Plan on 11 June 2007.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!