| <strong>Chapter</strong> 4 - P<strong>rogramme</strong> 2: Landward <strong>Defence</strong> |<br />
Annual Report FY 2007 - 2008 108<br />
| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />
Table 4.1 Landward <strong>Defence</strong> P<strong>rogramme</strong> Outputs for FY 2007/08 (continued)<br />
Output Performance Measure Target Actual Achievement<br />
Reserve core growth capability<br />
(Composite artillery capability)<br />
Air <strong>Defence</strong> Artillery Capability<br />
Training capability at School<br />
<strong>of</strong> Air <strong>Defence</strong> Artillery<br />
Regular core growth capability<br />
(Composite air defence<br />
artillery capability)<br />
Regular core growth capability<br />
(Mechanised air defence<br />
artillery capability)<br />
Reserves core growth<br />
capability<br />
(Mobile air defence artillery)<br />
Engineer Capability<br />
Training capability at the<br />
School <strong>of</strong> Engineers<br />
Number <strong>of</strong> units prepared<br />
according to force<br />
requirements<br />
Number <strong>of</strong> learners on air<br />
defence artillery courses<br />
Number <strong>of</strong> units prepared<br />
according to force<br />
requirements<br />
Number <strong>of</strong> units prepared<br />
according to force<br />
requirements<br />
Number <strong>of</strong> units prepared<br />
according to force<br />
requirements<br />
Number <strong>of</strong> learners on<br />
engineers courses<br />
2 x self-propelled GV 6 gun<br />
regiments<br />
2 x towed gun regiments<br />
1 x multiple rocket launcher<br />
regiment<br />
The Artillery Mobilisation<br />
Regiment was unfortunately<br />
never equipped to provide<br />
ready-to-issue Prime Mission<br />
Equipment to the School <strong>of</strong><br />
Artillery. The serviceability<br />
<strong>of</strong> the Prime Mission<br />
Equipment currently on the<br />
inventory with the Artillery<br />
Mobilisation Regiment<br />
hampered the outcome <strong>of</strong><br />
some <strong>of</strong> the courses presented<br />
at the School <strong>of</strong> Artillery.<br />
An example is Driving and<br />
Maintenance: the requirement<br />
to provide vehicles could not<br />
be met.<br />
620 learners on 32 courses 933 learners on 28 courses.<br />
4 x Regular courses cancelled.<br />
18 x additional informal<br />
courses presented in<br />
preparation for Phase 1<br />
commissioning <strong>of</strong> Ground-<br />
Based Air <strong>Defence</strong> System<br />
(GBADS).<br />
1 x air defence artillery<br />
regiment<br />
Leader group for battery, from<br />
3 x Reserves regiments as<br />
sources <strong>of</strong> manpower<br />
1 x air defence artillery<br />
regiment (Reserves)<br />
1 x air defence artillery<br />
regiment<br />
The capability was<br />
decommissioned or phased<br />
out. This is in accordance with<br />
the refined SA Army Plan<br />
FY 2007/08.<br />
80% provisioning <strong>of</strong> required<br />
units.<br />
HR: Insufficient leader group .<br />
HR: Insufficient ADA troops<br />
converted.<br />
Equipment: Insufficient<br />
product system technical<br />
support for PME.<br />
1 691 learners on 78 courses 972 learners on 71 courses.<br />
Eight in the process <strong>of</strong> being<br />
completed in April 2008.<br />
SA Army submitted Changes<br />
to Plan on 11 June 2007.