17.12.2012 Views

Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Measurable Objective<br />

| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />

To defend and protect the RSA by providing prepared and supported maritime combat forces, services and<br />

facilities that meet Government’s requirements.<br />

Outputs<br />

Details <strong>of</strong> the Maritime <strong>Defence</strong> P<strong>rogramme</strong> outputs are reflected in Table 6.1.<br />

Table 6.1 Maritime <strong>Defence</strong> P<strong>rogramme</strong> Outputs for FY 2007/08<br />

Output Performance Measure Target Actual Achievement<br />

Subp<strong>rogramme</strong> Maritime Direction Capability<br />

Strategic Direction<br />

Capability<br />

Force Preparation<br />

Direction Capability<br />

Implementation <strong>of</strong><br />

DOD policies, strategies<br />

and plans in respect <strong>of</strong><br />

maritime matters<br />

Expenditure <strong>of</strong> allocated<br />

budget as planned<br />

Compliance with force<br />

preparation requirements<br />

Subp<strong>rogramme</strong> Maritime Combat Capability<br />

Surface Combat<br />

Capability<br />

Submarine Warfare<br />

Capability<br />

Combat Support and<br />

Sealift Capability<br />

Number <strong>of</strong> vessels<br />

prepared according to<br />

force requirements<br />

Number <strong>of</strong> submarines<br />

prepared according to<br />

force requirements<br />

Number <strong>of</strong> vessels<br />

prepared according to<br />

force requirements<br />

Mine Warfare Capability Number <strong>of</strong> systems<br />

prepared according to<br />

force requirements<br />

Hydrographic Services<br />

Capability<br />

Maritime Reaction<br />

Squadron Capability<br />

Number <strong>of</strong> units<br />

prepared according to<br />

force requirements<br />

Number <strong>of</strong> Operational<br />

Boat Squadrons (OBS)<br />

prepared according to<br />

force requirements<br />

Number <strong>of</strong> maritime<br />

reaction force platoons<br />

prepared according to<br />

force requirements<br />

Number <strong>of</strong> operational<br />

diving teams prepared<br />

according to force<br />

requirements<br />

Patrol Capability Number <strong>of</strong> inshore<br />

patrol vessels prepared<br />

according to force<br />

requirements<br />

Full implementation<br />

100%<br />

3 x strike craft<br />

4 x frigates<br />

Achieved - implementation <strong>of</strong> DOD<br />

policies, strategies and plans in respect<br />

<strong>of</strong> maritime matters.<br />

100%<br />

100% All requirements for force employment<br />

complied with, as planned.<br />

2 x submarines<br />

1 x submarine undergoing<br />

post-delivery trials<br />

3 x strike craft were in the operational<br />

cycle; 2 were available during the<br />

period, with one in reserve.<br />

4 x frigates were available in the<br />

operational cycle.<br />

2 x submarines were in the operational<br />

cycle.<br />

The delivery <strong>of</strong> the third submarine<br />

was postponed to FY 2008/09 due to<br />

delays in the project.<br />

1 x combat support vessel 1 x combat support vessel.<br />

2 x mine warfare systems 2 x mine warfare systems consisting<br />

<strong>of</strong> 3 x mine hunters in the operational<br />

cycle.<br />

1 x vessel<br />

1 x mobile hydrographic<br />

survey team<br />

1 x vessel and 1 x mobile hydrographic<br />

survey team.<br />

1 x OBS 1 x OBS, prepared according to force<br />

requirements.<br />

3 x platoons 3 x platoons, prepared according to<br />

force requirements.<br />

3 x teams 3 x teams, prepared according to force<br />

requirements.<br />

3 x patrol vessels 3 x patrol vessels in the operational<br />

cycle.<br />

Certain spares lead-times resulted in<br />

the vessels having a lower operational<br />

availability than planned.<br />

137 Annual Report FY 2007 - 2008<br />

| <strong>Chapter</strong> 6 - P<strong>rogramme</strong> 4: Maritime <strong>Defence</strong> |

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!