| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />

Table 5.3 Air <strong>Defence</strong> P<strong>rogramme</strong>: Additional Funding for FY 2007/08 (continued)<br />

Policy Option<br />

Allocation<br />

(R’000)<br />

Astra Avionics Upgrade 8 000 Astra Avionics<br />

upgraded to Instrument<br />

Meteorological<br />

Conditions flight standard<br />

Output Targets Actual Achievement / Reasons for Deviations<br />

The PDSC approved re-allocation <strong>of</strong> the Rm8 to the<br />

air transport environment to create capacity to fly<br />

newly-qualified pilots. The Astra Avionics recovery<br />

has been covered by a multi-year additional allocation.<br />

Cessna C-208 maintenance and repair contract<br />

(Execujet): An additional Rm6,37 was allocated to<br />

the C-208 maintenance contract with Execujet, in<br />

order to increase the number <strong>of</strong> external servicings.<br />

This will allow the C-208 fleet serviceability rate to<br />

be improved to cater for an increased number <strong>of</strong><br />

students.<br />

Aviation Fuel Budget: Aviation fuel cost increases<br />

caused a predicted shortfall <strong>of</strong> Rm4,8 on the air<br />

transport budget for FY 2007/08. The remaining<br />

Rm1,63 was utilised to alleviate part <strong>of</strong> this shortfall.<br />

VIP Air Transport 23 716 Inkwazi operating cost Bills for overflight, landing and navigational fees<br />

are normally received up to eight months after<br />

completion <strong>of</strong> the flight. Only 430 <strong>of</strong> the planned<br />

645 hours were flown. Utilisation is dependent<br />

on Presidential requirements. The payments total<br />

Rm27,867.<br />

Performance and Service Delivery Improvement<br />

Details <strong>of</strong> the Air <strong>Defence</strong> P<strong>rogramme</strong>’s performance and service delivery are shown in Table 5.4.<br />

Table 5.4 Air <strong>Defence</strong> P<strong>rogramme</strong>: Performance and Service Delivery Improvement for<br />

FY 2007/08<br />

Activities<br />

Human<br />

Resources<br />

Transformation<br />

Review <strong>of</strong><br />

contracts<br />

Planned Management<br />

Interventions<br />

Implementation and<br />

monitoring <strong>of</strong> Air Force<br />

Board Focus Area to<br />

address the acquisition <strong>of</strong><br />

representative members for<br />

the core functions <strong>of</strong> the Air<br />

Force, and career preparation<br />

<strong>of</strong> representative members for<br />

the SDP aircraft<br />

Annual review <strong>of</strong> contracts to<br />

ensure cost-effective logistic<br />

support, and effect changes to<br />

those contracts where<br />

cost-effective support<br />

solutions are not found<br />

Anticipated Benefit Status Actual Achievement<br />

Meaningful and<br />

measurable progress<br />

towards the objectives <strong>of</strong><br />

the SAAF’s medium-term<br />

HR Strategy and SAAF<br />

Vision 2015<br />

Optimised service<br />

delivery and support that<br />

reflect a cost-effective<br />

balance between the<br />

operational requirement,<br />

the contracted work and<br />

the cost to the SAAF, thus<br />

assisting in reducing the<br />

overall cost <strong>of</strong> support<br />

Ongoing Although the planned end strength<br />

for the 2007/08 financial year did<br />

not materialise, overall black and<br />

female representivity in the South<br />

African Air Force increased by 6,2%<br />

and 2,3% respectively during the<br />

2007/08 financial year. This is in line<br />

with the South African Air Force’s<br />

objectives to bring about a 10%<br />

change in representivity over the<br />

period 2006/07 to 2008/09. Reasons<br />

for the planned end strength<br />

deviation were an unforeseen<br />

increase in the attrition rate and<br />

recruitment that did not materialise<br />

as planned. This deviation did<br />

not, however, hamper planned<br />

representivity changes.<br />

Ongoing The Contract Review Committee<br />

reviewed a number <strong>of</strong> user<br />

requirement specifications <strong>of</strong><br />

various systems’ contracts to<br />

eliminate duplication (and resultant<br />

fruitless expenditure), and a number<br />

<strong>of</strong> contracts were reviewed to<br />

ensure compliance with the User<br />

Requirement Statement.<br />

131 Annual Report FY 2007 - 2008<br />