Policy Option<br />

Military Skills<br />

Development System<br />

Operational Vehicles Rm152<br />

Maintenance and repair<br />

<strong>of</strong> B Vehicles<br />

| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />

Table 4.3 Outputs <strong>of</strong> Specific Policy Options Where Additional Funds Were Allocated for<br />

FY 2007/2008 (continued)<br />

Maintenance and repair<br />

<strong>of</strong> C Vehicles<br />

Maintenance and<br />

upgrading <strong>of</strong> LWT<br />

facilities (D Army Log)<br />

Allocations<br />

(R’000)<br />

Output Targets Actual Achievement Reason for Deviation<br />

38 000 To maintain the 3 000 Total simultaneously Insufficient funds were<br />

MSDS members who in the system: April to made available; therefore,<br />

joined in 2006/07, to December 2007 = 5 300 the SA Army had to<br />

rejuvenate the SA Army and January to March reduce its January 2008<br />

with an additional 3 000 2008 = 4 126 MSDS intake to a planned figure<br />

MSDS members and to members<br />

<strong>of</strong> 1 500 members and<br />

fund capacity building<br />

the current reality <strong>of</strong><br />

to accommodate MSDS 714 members were 1 612.<br />

members at allocated transferred to the CSS<br />

units<br />

and the rest (1 667) were<br />

made available to the<br />

Reserves<br />

123 000 To enhance the<br />

availability (80%) <strong>of</strong><br />

B Vehicles<br />

12 000 To enhance the<br />

availability <strong>of</strong> SA Army<br />

engineer vehicles<br />

10 350 To enhance work<br />

environment where<br />

vehicles need to be<br />

repaired and maintained<br />

TSC rejuvenation 6 650 Enhance environmental<br />

requirements and<br />

capability to maintain<br />

and repair vehicles<br />

Funding was insufficient<br />

to include capacity<br />

building for the<br />

accommodation <strong>of</strong> a<br />

larger MSDS intake<br />

Order and payment<br />

completed. Current<br />

availability <strong>of</strong> the B<br />

Vehicle fleet (approved<br />

supplementary<br />

instruction) is 80%<br />

Order and payment<br />

completed<br />

Current availability <strong>of</strong> the<br />

C Vehicles is 85%<br />

Layman’s scope <strong>of</strong> work<br />

has been conducted and<br />

certificate <strong>of</strong> essentiality<br />

submitted to DPW for<br />

approval<br />

DPW approval to<br />

commence with the work<br />

has been received<br />

Established and upgraded<br />

technical command and<br />

control infrastructure,<br />

including LAN/WAN<br />

and training manuals<br />

(Increase in capability<br />

from 45% to 95%)<br />

Due to the process with<br />

DPW, the work was<br />

unable to commence<br />

during FY 2007/08.<br />

P<strong>rogramme</strong>d to take place<br />

during FY 2008/09.<br />

113 Annual Report FY 2007 - 2008<br />