17.12.2012 Views

Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

Chapter 2 - P rogramme 1 - Department of Defence

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

| <strong>Chapter</strong> 5 - P<strong>rogramme</strong> 3: Air <strong>Defence</strong> |<br />

Annual Report FY 2007 - 2008 132<br />

| <strong>Department</strong> <strong>of</strong> <strong>Defence</strong> |<br />

Table 5.4 Performance and Service Delivery Improvement for FY 2007/08 (continued)<br />

Activities<br />

Logistic<br />

restructuring<br />

Reduction <strong>of</strong><br />

uniformed<br />

and PSAP<br />

personnel<br />

Reduction<br />

<strong>of</strong> Aero<br />

Manpower<br />

personnel<br />

Optimising<br />

the cost <strong>of</strong><br />

ownership <strong>of</strong><br />

air bases<br />

Planned Management<br />

Interventions<br />

To implement the redesigned<br />

logistic support concept in<br />

the SAAF in accordance with<br />

the approved SAAF Logistic<br />

Support Philosophy and the<br />

guidelines in SAAF Vision<br />

2015<br />

Possible reduction <strong>of</strong><br />

personnel in accordance with<br />

optimal force structure in the<br />

process <strong>of</strong> being determined<br />

Reduction <strong>of</strong> personnel in<br />

accordance with the optimal<br />

force structure, to achieve a<br />

ceiling number <strong>of</strong> 500 AMG<br />

members in support <strong>of</strong> flying<br />

operations<br />

Implementation <strong>of</strong> an Air<br />

Base Strategy and Air Base<br />

Support Plan to ensure the<br />

optimal and cost-effective<br />

support <strong>of</strong> all air bases<br />

Anticipated Benefit Status Actual Achievement<br />

An optimised logistic<br />

support system that<br />

reflects a cost-effective<br />

balance between organic<br />

SAAF logistic support and<br />

outsourced support, thus<br />

assisting in reducing the<br />

overall cost <strong>of</strong> support<br />

Possible reduction in<br />

personnel costs<br />

Retention <strong>of</strong> optimised<br />

HR complement in<br />

support <strong>of</strong> allocated roles<br />

and responsibilities/<br />

functions<br />

Reduction in overall<br />

personnel and contract<br />

costs<br />

Reduction in overall cost<br />

<strong>of</strong> ownership, resulting in<br />

enhanced maintenance <strong>of</strong><br />

air bases<br />

Ongoing Directorate Base System Support<br />

Systems at Level 3 was restructured<br />

to create a separate Directorate<br />

Supply Support, which has had a<br />

very positive effect on the supply<br />

support environment within the<br />

Air Force. The SAAF Logistic<br />

Strategic Plan is under revision and<br />

the Air Force unit’s structures are<br />

being reviewed for optimisation<br />

<strong>of</strong> resources. The DOD logistic<br />

realignment process has taken<br />

priority and may influence the future<br />

Air Force logistic restructuring.<br />

In process The South African Air Force<br />

Human Resource budget strength<br />

will increase from FY 2010/11,<br />

instead <strong>of</strong> decreasing. In support<br />

<strong>of</strong> Government’s initiative, the Air<br />

Force plans to recruit 650 Military<br />

Skills Development System members<br />

as part <strong>of</strong> the normal recruitment<br />

drive and 350 additional members as<br />

part <strong>of</strong> the Project 24 commitment.<br />

Ongoing 655 in January 2008. Contract<br />

renegotiation is presently in process.<br />

The AMG contract is to be reviewed<br />

and a new User Requirement<br />

Statement compiled to address<br />

reduction possibilities.<br />

Task complicated by resignations <strong>of</strong><br />

uniformed personnel, resulting in<br />

higher demands on AMG personnel.<br />

Ongoing The Air Base Strategy has been<br />

incorporated into SA Air Force<br />

Vision 2015.<br />

The logistic element <strong>of</strong> this task<br />

is included in Ser No 3 (Logistic<br />

Restructuring). This requirement is<br />

included as an objective through the<br />

Air Servicing Unit Capability Plan.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!