10.09.2013 Views

TABLE OF CONTENTS - BGB Analytik AG

TABLE OF CONTENTS - BGB Analytik AG

TABLE OF CONTENTS - BGB Analytik AG

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

EI high temperature filament, G2590-60053<br />

MSD Filaments<br />

Like the filaments in an incandescent light bulb, the ion source filaments will eventually burn<br />

out. Certain practices will reduce the chance of early failure.<br />

• When setting up data acquisition parameters, set the solvent delay so that the analyzer<br />

will not turn on while the solvent peak is eluting.<br />

• When the software prompts 'Override solvent delay at the beginning of a run' always<br />

select 'No.'<br />

• Higher emission current will reduce filament life.<br />

• If you are controlling your MSD from the Edit Parameters screen, always select 'MS Off'<br />

before changing any of the filament parameters.<br />

MSD Filaments<br />

Description 5975 Series 5973 Series 5972 Series 5971 Series<br />

Filament assembly (EI) G2590-60053 G2590-60053 G2590-60053 05971-60140<br />

Filament assembly (CI) G1099-80053 G1099-80053<br />

Micro ion vacuum gauge G3170-80001<br />

Triode gauge tube for<br />

measuring vacuum<br />

0960-0897<br />

Tips & Tools<br />

It is very useful to switch from one filament to the other every three months so<br />

that when filament fails, you know the other will fail soon. This will allow you to<br />

change both filaments at the same time. Since the GC/MS system is already<br />

vented, it's a good idea to replace other supplies in the flowpath at the same time<br />

as the filaments.<br />

www.agilent.com/chem/supplies<br />

MSD Filaments<br />

GC and GC/MS<br />

213

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!