10.09.2013 Views

TABLE OF CONTENTS - BGB Analytik AG

TABLE OF CONTENTS - BGB Analytik AG

TABLE OF CONTENTS - BGB Analytik AG

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

1100/1200 Series LC Maintenance Schedule<br />

1100/1200 Series<br />

Instrument Parts and Supplies<br />

The Agilent 1100/1200 Series HPLC modules were designed for long hours of operation<br />

and ease of use. To keep your system operating at optimal performance, scheduled<br />

routine maintenance is advised. Regular attention to these tasks will further increase<br />

your lab's productivity.<br />

Recommended Routine Maintenance Procedures<br />

• Clean or replace the solvent inlet filter<br />

• Flush the degasser<br />

• Perform pump maintenance<br />

• Perform autosampler maintenance<br />

• Perform column switching valve maintenance (if installed)<br />

• Perform detector maintenance<br />

The time needed is approximately 4 hours for a complete system. The frequency of<br />

maintenance is dependent upon your usage and applications.<br />

Failure to maintain your HPLC can have these results:<br />

• Variations in flow and area counts, causing poor precision of quantitative analyses<br />

• Noisy baselines make integration and peak recognition difficult<br />

• Poor injection volume precision may result if the autosampler is not maintained<br />

• Retention time fluctuations can lead to improper peak identification<br />

• If you regularly use UV spectra, the quality of the spectra will be comprised, jeopardizing<br />

peak identification<br />

The 1100/1200 Series LC instruments and columns are manufactured under very high quality<br />

standards and are well known for their robustness and reliability, delivering the same precise<br />

results in daily operation. To ensure that your instrument is also working to your fullest<br />

satisfaction, we recommend exchanging the few parts which have a natural wear at a regular<br />

maintenance schedule.<br />

www.agilent.com/chem/supplies<br />

LC and LC/MS<br />

505

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!