13.07.2015 Views

Brocade MLX Series and Brocade NetIron XMR Hardware ...

Brocade MLX Series and Brocade NetIron XMR Hardware ...

Brocade MLX Series and Brocade NetIron XMR Hardware ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Installing a <strong>Brocade</strong> <strong>MLX</strong>-32 router 35. Slide the router onto the lift plate.DANGERFour or more people are required to position the unpopulated router into the rack.DANGERDo not use the h<strong>and</strong>les on the power supply units or fan modules to position the router.6. Secure the router to the mechanical lift with a strap to prevent tipping.7. Carefully position the router in front of the rack where it is to be installed.8. Remove the strap securing the router to the lift.Installing a <strong>Brocade</strong> <strong>MLX</strong>-32 routerThis section describes how to install a <strong>Brocade</strong> <strong>MLX</strong>-32 router.NOTEIllustrations in this chapter may differ slightly from the actual equipment.Preparing the installation siteBefore installing the router, plan the location <strong>and</strong> orientation relative to other devices <strong>and</strong>equipment. For cooling purposes, allow a minimum of six inches of space between the sides, front,<strong>and</strong> the back of the router <strong>and</strong> walls or other obstructions. If a router is installed within a perforatedenclosure, the perforations must cover at least 60 percent of the surface.You will need to use a mechanical lift to move <strong>and</strong> install the router. Be sure to allow enoughworking room for the lift.NOTEMake sure your site provides 200-240 AC power.Ensure that the proper power <strong>and</strong> network cabling is installed at the site.For information on cabling, refer to “<strong>Brocade</strong> <strong>MLX</strong>-32 cable management” on page 213, “Installingpower supplies in a <strong>Brocade</strong> <strong>MLX</strong>-32 router” on page 222, “Attaching a management station” onpage 227.<strong>Brocade</strong> <strong>MLX</strong>-32 router shipping carton contentsThe <strong>Brocade</strong> <strong>MLX</strong>-32 router ships with the following items:• Router chassis with the empty slots covered with upper <strong>and</strong> lower shipping panels. The routeris housed in a wooden shipping crate that is strapped to a pallet.• The appropriate number of interface modules, switch fabric modules, management modules,<strong>and</strong> power supplies (four AC or four DC) in separate shipping cartons.<strong>Brocade</strong> <strong>MLX</strong> <strong>Series</strong> <strong>and</strong> <strong>Brocade</strong> <strong>NetIron</strong> <strong>XMR</strong> <strong>Hardware</strong> Installation Guide 19553-1002373-02

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!