Project Type Number of projects Name of project<br />

Relocation of<br />

mobile classrooms<br />

Forums<br />

Toilets<br />

Upgrading projects<br />

<strong>Annual</strong> <strong>Performance</strong> <strong>Plan</strong> 2007/08 – 2009/10<br />

27 Bloekombos SS (22), Sir Lowreys Pass PS (3), Vuyani PS (2).<br />

Other projects will only be identified during the financial year, when<br />

classrooms become available<br />

Primary schools 2 Turfhall PS, Mzamomtsha PS<br />

Secondary schools 8 Ravensmead SS, Mondale SS, Mountview PS, Sarepta SS,<br />

Rocklands SS, Phoenix SS, Scottsville SS, Knysna SS<br />

Primary school 279 Samora Marchall PS (34 ), Vredendal PS (17 ), Smutsville PS (18),<br />

Table View PS (34), Heinz Park PS (34), Khayelitsha PS no 1 (34),<br />

Khayelitsha PS No 2 (34), Delft N2 Gateway PS (34), Dalebuhle<br />

PS (17 ), Buffels Nek PS (5), Reenendal PS (18)<br />

Secondary school 150 Enkwenkwezi SS (27), Khayelitsha No 1 SS (27), Khayelitsha No 2<br />

SS (27), Khayelitsha No 3 SS (27), Khayamandi SS (27),<br />

Schoonspruit SS (15).<br />

Primary schools 1 Thembani PS (administrative facility),<br />

Secondary school 4 Esselenpark SS(administrative facility), Oaklands SS<br />

((administrative facility), Thandokhulu SS (administrative<br />

facility),South Peninsula SS(replacement of prefab classrooms with<br />

permanent classrooms)<br />

Special schools 0 Nil<br />

Building maintenance over the MTEF (2007/08 to 2009/10)<br />

Number of projects Budget Available<br />

R’000<br />

500 R163,564 million<br />

The estimated cost of replacing all existing school buildings in the Western Cape is R12 billion. According to the Civil Service<br />

Code, 1,5% of the replacement value of a building should be made available to maintain it annually. An amount of R180<br />

million should thus be budgeted annually to maintain education buildings in the Western Cape.<br />

The annual maintenance budget for 2007/08 is R25,221 million and this amount represents a mere 14% of what is required.<br />

The total maintenance budget for the past two years amounts to R165 million. If the same calculation is done i.e. 1,5% of<br />

replacement value, then the answer indicates that the buildings are deteriorating and that maintenance backlogs are clearly<br />

increasing.<br />

Asset Management<br />

• Immovable assets<br />

The WCED uses the Education Management Information System (EMIS) and the Schools Register of Needs<br />

Information System (SRNIS), which are adequate in managing immovable assets<br />

• Major movable assets<br />

Head Office and EMDCs(including offices linked to EMDCs)<br />

In respect of moveable assets the WCED established an asset management unit. This unit is one of the pillars of the<br />

Supply Chain Unit.<br />

77