13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

10.0 DRILLINGInformation in this section has been excerpted from Olssen <strong>and</strong> Jones (2012c) which wassourced from sections within Ghaffari et al. (2012). Snowden has updated <strong>and</strong> verifiedthis information.10.1 HISTORICAL DRILLINGDrilling on the Property dates back to the 1960s, although most of the historical drillingwas completed in the late 1980s <strong>and</strong> early 1990s. Up to this time, 452 surface diamonddrillholes were completed, which totalled 60,854 m. These holes were relatively short,averaging 135 m per hole, <strong>and</strong> were mostly concentrated on West Zone, followed byShore Zone, Galena Hill <strong>and</strong> Gossan Hill. As part of this exploration program, anexploration ramp was driven on the West Zone from which an additional 442underground diamond drillholes were completed, which totalled 33,750 m. This drillingwas focused exclusively on West Zone <strong>and</strong> increased the drill density to approximately5 m centres between 5 m <strong>and</strong> 10 m sections. Historical drill core sizes for surfacedrillholes were NQ (47.6 mm diameter) <strong>and</strong> BQ (36.5 mm diameter). Core size fordrillholes collared from the underground exploration ramp was AQ (27 mm diameter).10.2 SILVER STANDARD DRILLINGUsing the historical drill <strong>and</strong> trench data as a baseline, <strong>and</strong> following on the success ofthe Snowfield bulk tonnage drilling to the north, the 2009 Brucejack drill program wasdesigned to test for additional bulk tonnage resources on the Property. This programsuccessfully discovered several areas with bulk tonnage mineralization. Within thebroader bulk tonnage mineralization were locally discreet high-grade intersections.These included holes SU-5 <strong>and</strong> SU-12, which were drilled to test for the westernextension of the previously defined Galena Hill. These two holes intersected 1.5 m of215 g/t Au <strong>and</strong> 1.5 m of 16,949 g/t Au, respectively, in what would eventually be calledVOK. Drilling in 2009 totalled 17,846 m in 37 holes, of which 2,913 m in 6 holes weretargeted at VOK.In 2010, the drill program was designed to further define the bulk tonnage mineralizationfound the previous year, as well as to attempt to define a high-grade resource at VOK. Inthis year, a total of 73 diamond drillholes was completed which totalled 33,400 m. Ofthis, 11 holes comprising 3,693 m were targeted at VOK, <strong>and</strong> 2 holes totalling 1,119 mat the footwall of West Zone. In VOK, wide-spaced drilling intersected enough high-grademineralization to confirm the exploration potential of the zone. The exploration potentialincluded the preliminary definition of some of the ore controls, which put theintersections into a geologic context. The West Zone drilling intersected a broad zone ofbulk tonnage mineralization, within which were several high-grade intersections.Pretium Resources Inc. 10-1 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!