28.17 CLAYTON RICHARDS, P.ENG.I, Clayton Richards, P.Eng., of Thunder Bay, Ontario, do hereby certify:• I am a Chief Systems <strong>and</strong> Process Control Engineer with Tetra Tech WEI Inc. with abusiness address at 725 Hewitson Street, Thunder Bay, Ontario, P7B 6B5.• This certificate applies to the technical report entitled <strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong><strong>Report</strong> on the Brucejack Project, Stewart, BC, dated June 21, 2013 (the “<strong>Technical</strong><strong>Report</strong>”).• I am a graduate of Lakehead University (Bachelor of Engineering (Electrical, 1989). Iam a member in good st<strong>and</strong>ing of the Association of Professional Engineers Ontario,License #90277922. I am an accomplished automation engineer with 23 years ofexperience in process control <strong>and</strong> DCS systems for the mining <strong>and</strong> pulp <strong>and</strong> paperindustries. My experience includes designing, managing <strong>and</strong> commissioning variousDCS <strong>and</strong> process control projects. I am a “Qualified Person” for the purposes ofNational Instrument 43-101 (the “Instrument”).• I did not complete a personal inspection of the Property.• I am responsible for Sections 18.14 <strong>and</strong> 28.17 of the <strong>Technical</strong> <strong>Report</strong>.• I am independent of Pretium Resources Inc. as defined by Section 1.5 of theInstrument.• I have no prior involvement with the Property that is the subject of the <strong>Technical</strong> <strong>Report</strong>.• I have read the Instrument <strong>and</strong> the sections of the <strong>Technical</strong> <strong>Report</strong> that I amresponsible for has been prepared in compliance with the Instrument.• As of the date of this certificate, to the best of my knowledge, information <strong>and</strong> belief,the sections of the <strong>Technical</strong> <strong>Report</strong> that I am responsible for contains all scientific <strong>and</strong>technical information that is required to be disclosed to make the <strong>Technical</strong> <strong>Report</strong> notmisleading.Signed <strong>and</strong> dated this 25 th day of June, 2013 at Thunder Bay, OntarioOriginal document signed <strong>and</strong> sealed byClayton Richards, P.Eng.Clayton Richards, P.Eng.Chief Systems <strong>and</strong> Process Control EngineerTetra Tech WEI Inc.Pretium Resources Inc. 28-19 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!