13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

12.0 DATA VERIFICATIONIndependent sampling <strong>and</strong> site verification visits were undertaken by P&E in 2011 <strong>and</strong> bySnowden in 2012.The information in this section pertaining to the P&E work has been excerpted fromOlssen <strong>and</strong> Jones (2012c), which was sourced <strong>and</strong> updated from sections within Ghaffariet al. (2012).12.1 SITE VERIFICATION AND INDEPENDENT SAMPLING BY P&EThe Property was visited by Mr. Fred Brown, CPG, Pr.Sci.Nat., from September 13 to 15,2011. Independent verification sampling was completed on diamond drill core, with tensamples distributed in nine holes collected for assay. An attempt was made to sampleintervals from a variety of low- <strong>and</strong> high-grade material. The chosen sample intervalswere then sampled by taking the remaining half-split core. The samples were thendocumented, bagged, sealed with packing tape, <strong>and</strong> brought by Mr. Brown to ALS inTerrace, BC, for analysis.At no time, prior to the time of sampling, were any employees or other associates of<strong>Pretivm</strong> advised as to the location or identification of any of the samples to be collected.A comparison of the P&E independent sample verification results versus the originalassay results are shown in Figure 12.1 <strong>and</strong> Figure 12.2.Pretium Resources Inc. 12-1 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!