13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 13.37Head Grade(g/t)Metallurgical Performance Projection – West ZoneGold <strong>and</strong> Silver Recovery(%)Doré - Gold< 0.5 = 00.5 to 9.99 = - 0.147*((Head Grade, g/t) 2 ) + 5.68*(Head Grade, g/t) - 1.2149.99 to 40 = 7.32*ln(Head Grade, g/t) + 24.012> 40 = 52Doré - Silver 500 = 1.0Flotation Concentration - Gold< 0.5 = 300.5 to 5.64 = 85.44*(Head Grade, g/t) 0.056 + 0.147*(Head Grade, g/t) 2 - 5.68*(Head Grade, g/t) + 2.5.64 to 9.99 = 1.18*ln(Head Grade, g/t) + 0.147*((Head Grade, g/t) 2 ) - 5.68*(Head Grade, g/t) +94.0949.99 to 40 = - 6.14*ln(Head Grade, g/t) + 68.958> 40 = 45.9Flotation Concentration - Silver< 3.0 = 353.0 to 130 = 2.9741*ln(Head Grade, g/t) - (34.643*((Head Grade, g/t) - 0.48 )) + 73.956130 to 500 = 2.9741*ln(Head Grade, g/t) + 72.456> 500 = 91.5Pretium Resources Inc. 13-55 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!