13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 12.4Sample Verification Results for Silver GradesBrucejack PropertySnowden sample validation, June 2012AG g/t302520151050L602569L602571L605214L605215M515283M515284N348071N348072N360192N360193N360355N360356Sample numberSnowden Ag<strong>Pretivm</strong> AgSnowden has not undertaken a complete data verification study; however, sufficientchecks have been completed to satisfy Snowden that the Brucejack drilling <strong>and</strong> samplingdata is suitable to use in estimating a mineral resource.Pretium Resources Inc. 12-5 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!