13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Figure 13.1 Gold Recovery versus Primary Grind Size (2012)Figure 13.2 Silver Recovery versus Primary Grind Size (2012)Recovery, % Ag10098969492908886848280VOK 1VOK 2VOK 3VOK 4WZ 1WZ 20 20 40 60 80 100 120Grind Size, 80% Passing, µmThe results indicate that gold <strong>and</strong> silver responded very well to the tested processconditions. At the grind size of 80% passing 70 µm, approximately 96 to 97% of the gold,<strong>and</strong> 91 to 92% of the silver, were recovered to the gravity concentrate <strong>and</strong> bulk flotationconcentrate. Gold in the mineralization shows a better metallurgical response to thesimple <strong>and</strong> conventional flowsheet when compared to silver.Pretium Resources Inc. 13-13 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!