13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 20.5List of Federal Approvals <strong>and</strong> Licences that May be Required to Develop theBrucejack ProjectFederal Government Approvals <strong>and</strong> LicencesEnabling LegislationCEAA Approval CEAA 2012Alteration of flow on international riverInternational Rivers Improvement ActMMERFisheries Act/Environment CanadaNavigable Water: stream crossings authorizationNavigable Waters Protection ActNavigable Water: sub-aqueous disposal of waste rock <strong>and</strong> tailings Navigable Waters Protection ActExplosives Factory LicenceExplosives ActAmmonium Nitrate Storage FacilitiesCanada Transportation ActRadio LicencesRadio Communication ActRadioisotope Licence (nuclear density gauges/x-ray Analyzer)Atomic Energy Control Act20.2.3 FINANCIAL ASSURANCE<strong>Pretivm</strong> will provide financial assurance, in the form of bonding, that the Project will beclosed <strong>and</strong> reclaimed according to the reclamation <strong>and</strong> closure plan. Bonding or securityamounts generally increase as disturbance <strong>and</strong> infrastructure increase such that, if theProject is stopped, there will be sufficient funds to close the Project according to thereclamation <strong>and</strong> closure plan.The construction period for the Project will be between 18 <strong>and</strong> 24 months, at whichstage, the portals will be installed as well as the mill <strong>and</strong> other structures. As no increasein disturbance above-ground <strong>and</strong> no additional infrastructure will be developed duringthe operations stage, the amount of the security amount should be close to the maximumamount by the end of the construction period. As there will be little opportunity toprogressively close <strong>and</strong> reclaim the Project areas during the operations stage, themaximum security amount will be held by the MEMNG until the end of operations. Allinterest on the security amount will belong to <strong>Pretivm</strong>.Pretium Resources Inc. 20-26 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!