13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

25.0 INTERPRETATION AND CONCLUSIONS25.1 MINERAL RESOURCEIn November, 2012, an updated Mineral Resource estimate was prepared for VOK <strong>and</strong>West Zone at the Brucejack Property of <strong>Pretivm</strong> located near Stewart, BC. The Measured,Indicated <strong>and</strong> Inferred Mineral Resource estimates, effective November 2012 wereintended for use in a feasibility study for a high-grade underground mining scenario.25.2 MINERAL PROCESSING AND METALLURGICAL TESTINGThe test results from all the test programs indicate that the mineralization respondedwell to the conventional gravity <strong>and</strong> flotation combined concentration which are widelyused to recover gold <strong>and</strong> silver from this type of ore, especially ones containingsignificant amounts of nugget gold. In general, the VOK Zone <strong>and</strong> West Zonemineralization is moderately hard.The proposed process consists of one stage of crushing (located underground), a SAG<strong>and</strong> ball mill primary grinding circuit integrated with gravity concentration, rougherflotation, followed by rougher flotation concentrate regrinding <strong>and</strong> cleaner flotationprocesses. A gravity concentration circuit is also incorporated in the bulk concentrateregrinding circuit. By melting the gravity concentrate produced from the gravityconcentration circuits a gold-silver bearing flotation concentrate <strong>and</strong> gold-silver doré areproduced.The equipment that has been incorporated into the design is widely operated in theindustry.25.3 MINING METHODSThe Project orebody can be extracted economically through underground miningemploying long hole stoping methods in conjunction with paste backfill. Moderntrackless mobile equipment will be employed for the majority of mining activities. The orewill be transported to surface by conveyor belt.A two-year mine development phase is projected. The mineral reserves identified supporta mine life of 22 years at 2,700 t/d, with a steady state reached in Year 2 of productionoperations. There is further mineralization at depth that may add to the total resourceavailable for mining.Pretium Resources Inc. 25-1 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!