13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

16.3.3 STOPE SEQUENCEThe mining sequence in any lens of a given block begins with the extraction of theprimary stopes on the first (lowest) level. Wherever possible, the first primary stope willbe located near the middle of the lens to develop a pattern of stope extraction thatmoves outwards to the extremities of the lens while progressing upwards towards thetop. This generally promotes a favourable redistribution of ground stress, although manysmaller lenses in the Brucejack orebody are either irregular in shape or of insufficientdimensions to properly develop this sequence.When the adjacent primary stopes from the level above have been filled <strong>and</strong> cured,secondary stoping will commence. Figure 16.10 illustrates typical sequencing for themore massive lenses at the Property.Pretium Resources Inc. 16-14 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!