13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Figure 13.28 Variability Test Results – Silver Metallurgical Performance (2010-2011)13.3.9 LOCKED CYCLE TEST (2012 AND 2013)In order to better examine recovery <strong>and</strong> concentrate grade, four locked cycle tests werecompleted in 2012 on two master composites, which consisted of one blend from theVOK Zone (VOK-1, - 2, -3, -4) <strong>and</strong> one from the West Zone (WZ-1, -2). The procedureincluded:• primary grinding targeting a moderate size of 80% passing 80 to 85 µm• gravity concentration• rougher <strong>and</strong> scavenger flotation with the scavenger concentrate recycled• rougher concentrate cleaner flotation.For tests FLC1 <strong>and</strong> FLC3, the rougher concentrates were reground prior to cleanerflotation. In an effort to activate gold- <strong>and</strong> silver-bearing minerals, copper sulphate wasadded during the rougher <strong>and</strong> cleaner flotation stages.In 2013, two separate locked cycle tests were conducted on two composites generatedfrom the upper <strong>and</strong> lower zones of the VOK deposit. The test procedure used was similarto that used for the locked cycle tests in 2012.Pretium Resources Inc. 13-47 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!