Table 16.7LOM Tonnes <strong>and</strong> GradesYearOre(Mt)Au(g/t)Ag(g/t)-2 0.0 5.7 10-1 0.2 13.4 111 0.6 16.3 132 0.9 13.8 113 1.0 13.1 114 1.0 15.8 125 1.0 17.1 146 1.0 12.7 97 1.0 15.5 118 1.0 14.0 109 1.0 14.0 1110 1.0 11.2 1811 1.0 12.6 1412 1.0 12.1 5513 1.0 12.8 1914 1.0 11.9 2015 1.0 9.6 6016 1.0 12.3 3617 1.0 8.1 9818 0.9 6.2 23719 0.5 5.2 28920 0.5 5.4 33321 0.4 4.1 28222 0.1 3.2 269Total 19.0 12.0 5816.5 GEOTECHNICAL16.5.1 OVERVIEWGeotechnical designs <strong>and</strong> recommendations are based on the results of siteinvestigations <strong>and</strong> geotechnical assessments, which included rock masscharacterization, structural geology interpretations, excavation <strong>and</strong> pillar stabilityanalyses, <strong>and</strong> ground support design.Geotechnical site investigations completed to support the underground rock mechanicsassessments included: geotechnical drilling <strong>and</strong> logging, oriented drill coremeasurements, borehole televiewer surveys, laboratory testing of rock core samples, <strong>and</strong>installation of borehole instrumentation to measure groundwater pressures.Geotechnical mapping of the dewatered historic underground workings was completed toprovide structural geology information; the geotechnical performance of excavations inPretium Resources Inc. 16-26 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!