15.0 MINERAL RESERVE ESTIMATES15.1 GENERALThe mine design <strong>and</strong> mineral reserve estimation have been completed to a level ofappropriate for feasibility studies. The mineral reserve estimate stated herein isconsistent with the CIM St<strong>and</strong>ards on mineral resources <strong>and</strong> mineral reserves <strong>and</strong> issuitable for public reporting. As such, the mineral reserves are based on Measured <strong>and</strong>Indicated Resources, <strong>and</strong> do not include any Inferred Resources.The mineral reserves were developed from the resource model, “bjbm_1211_v2_cut”,which was provided to AMC by Snowden−on behalf of <strong>Pretivm</strong>−in November 2012.15.2 CUT-OFF GRADEA NSR cut-off grade of $180/t of ore was used to define the mineral reserves, which isunchanged from the value used for both the June 2011 PEA (Ghaffari et al. 2011) <strong>and</strong>the February 2012 Updated PEA (Ghaffari et al. 2012). In the 2012 Updated PEA, siteoperating costs were estimated at approximately $171/t based on a 1,500 t/d operation,of which $104/t was attributable to mining. The cut-off grade thus provided a minimummargin of $9/t of ore mined.The feasibility study provides the platform for increasing the accuracy of cost estimationsrelative to the 2011 <strong>and</strong> 2012 PEAs. Furthermore, the design production rate has beenincreased from 1,500 to 2,700 t/d. Average site operating costs over the LOM are nowevaluated as follows:• Mining: $94.4/t• Processing: $18.2/t• Surface Services: $19.6/t• G&A: $25.5/t• Total: $157.7/tThe $180/t NSR cut-off grade provides a minimum $22.3/t operating margin on oremined.Pretium Resources Inc. 15-1 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!