13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

24.1.15 RISK MANAGEMENTA Risk Assessment Workshop was conducted during the <strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> a RiskRegister developed which identified the following high level, medium level <strong>and</strong> low levelrisks.• 49 high level risks• 135 medium level risks• 246 low level risks.An additional four risks were identified but not assessed <strong>and</strong> required more informationfor an assessment to be made.These risks will be further reviewed <strong>and</strong> mitigated throughout the design, construction,<strong>and</strong> commissioning stages. The reviews will identify the relevant risks <strong>and</strong>/oropportunities associated with the Project, assess them against outcome objectives, <strong>and</strong>then determine the best way to eliminate/control the risks or take advantage ofopportunities.Pretium Resources Inc. 24-20 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!