13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

14.0 MINERAL RESOURCE ESTIMATESSnowden previously completed mineral resource estimates for different areas of theProject. Initially (September 2012), these estimates were aimed at evaluating thebroader lower-grade mineralized areas including Bridge Zone, Gossan Hill, <strong>and</strong> ShoreZone (Olssen <strong>and</strong> Jones 2012b). No estimates have been prepared for these zones toconsider the potential for underground extraction.More recent estimates, also completed by Snowden, were focused on evaluating thehigher-grade areas. These estimates were reported at a high-grade cut-off for potentialunderground extraction. They include:• a mineral resource estimate for West Zone (Olssen <strong>and</strong> Jones 2012a)• a mineral resource estimate for the VOK mineralized area (Olssen <strong>and</strong> Jones2012c).14.1 DISCLOSUREThe mineral resources were prepared by Snowden under the supervision of QP IvorJones, Executive Consultant <strong>and</strong> an employee of Snowden Mining Industry ConsultantsInc. (Olssen <strong>and</strong> Jones, 2012c). The effective date of the resource estimate wasNovember 20, 2012.The author, by way of experience <strong>and</strong> qualifications, is a QP as defined by NI 43-101 <strong>and</strong>is independent of <strong>Pretivm</strong>.14.2 KNOWN ISSUES THAT MATERIALLY AFFECT MINERAL RESOURCESThe author of this section is not aware of any permitting, legal, title, taxation, socioeconomic,<strong>and</strong> marketing or political issues that could materially affect the mineralresource estimates.14.3 ASSUMPTIONS, METHODS AND PARAMETERSThe estimates were prepared in the following steps:• data validation• data preparation (this <strong>and</strong> subsequent steps are summarized below)• exploratory data analysisPretium Resources Inc. 14-1 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!