13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

un was completed representing glaciers as constant head boundaries with the boundaryset to topography (i.e. the glacier surface). This run, which represents the maximumrecharge scenario under glaciated areas, resulted in an increase in mine inflows by afactor of 1.8, with an estimated inflow averaging approximately 4,600 m 3 /d on an annualbasis.The estimates of groundwater inflow to the underground workings provided should berevisited if significant deviations from the proposed mining plans are expected. Theresults of the sensitivity runs have been provided to show the range of inflow estimatespredicted by the model. For planning purposes, the most conservative inflows areprovided by the ‘High K Mine Inflows” model run (the dark purple line, Figure 16.15) <strong>and</strong>the base case (the dark blue line, Figure 16.15) provides the best estimate of inflowsusing the existing dataset.16.7 MOBILE EQUIPMENT REQUIREMENTS16.7.1 PRE-PRODUCTION PHASEDuring the preproduction phase, over 14,000 m of lateral development must becompleted to meet the ramp-up production schedule. Development during this periodwill peak at approximately 660 m/mo, but with the average over the pre-productiontimeframe at about 600 m/mo. A contractor will be utilized to supply manpower <strong>and</strong>expertise to excavate the initial capital waste development program of ramps, drifts, <strong>and</strong>raises that are detailed in the pre-production development program described in Section16.4.2.To reduce risk associated with contractor supplied fleets, a portion of the pre-productionmining equipment will be supplied by <strong>Pretivm</strong>. Table 16.11 shows the breakdown of<strong>Pretivm</strong> <strong>and</strong> contractor supplied equipment for the pre-production development phase.The ancillary equipment during this period will be supplied by <strong>Pretivm</strong>.Table 16.11Contractor <strong>and</strong> <strong>Pretivm</strong> Equipment during Pre-production DevelopmentDescription Contractor <strong>Pretivm</strong> TotalTwo boom mining jumbo 1 3 4LHD, 14 t (Development) 3 2 5LHD, 14 t (Production) 0 0 0Haulage truck, 40 t 0 3 3Bolter 0 2 2Cable bolter 0 1 1Shotcrete sprayer 0 2 2ITH long hole drill 0 1 1Transmixer 0 2 2Note: ITH = in-the-holePretium Resources Inc. 16-39 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!