13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

• small tools• consumables• contractor’s personal protective equipment• non-productive time (such as tool box briefing, breaks, etc.)• supervision• overhead <strong>and</strong> profit.Travel <strong>and</strong> a living out allowance have been calculated separately <strong>and</strong> are included in theconstruction indirects section.21.1.12 PRODUCTIVITY FACTORA productivity factor of 1.20 has been applied to the labour portion of the estimate toallow for inefficiencies, based on historical data for similar projects in this region.The six different classes of production elements affecting work efficiencies are:• General Economy/Competing Projects – an allowance of 5% has been added toallow the Project to attract labour from other areas or projects.• Project Supervision – the quality <strong>and</strong> experience of available supervision willhave a significant impact on productivity for the Project as well as the ratio ofsupervisors to workers.• Labour Relationship – it is envisioned that the Project would be an open shopenvironment.• Job Conditions – the size of the Project is the largest factor in this category. Ingeneral, very small or very large projects experience a significant loss ofproductivity. This includes a general allowance, job preparation allowance,personal care allowance, extra man allowance <strong>and</strong> moving time allowance.Other condition factors include walking/driving distance, height, underground orlow rooms, enclosed spaces, dust, temperature, noise, protective clothingrequirements <strong>and</strong> congestion.• Construction Equipment <strong>and</strong> Tools – it is assumed that all equipment will benew; however, weather <strong>and</strong> local conditions will impact the typical operation ofequipment.• Weather – temperature is one of the largest factors when assigning aproductivity factor.• Estimate Details – Level 1 Major AreaMAJOR AREA 11 – OVERALL SITEThe largest component in this area is bulk earthworks/site preparation cost of$28.2 million. Other significant components in this section include the site roadsPretium Resources Inc. 21-6 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!