18.0 PROJECT INFRASTRUCTURE18.1 OVERVIEWThe Project will require the development of a number of infrastructure items, both on-site<strong>and</strong> off-site. The locations of project facilities <strong>and</strong> other infrastructure items wereselected to take advantage of local topography, accommodate environmentalconsiderations, avoid avalanche hazards, <strong>and</strong> ensure efficient <strong>and</strong> convenientunderground crew shift change by locating the mine dry in close proximity to the mineportal. An overall site layout is shown in Figure 18.1 <strong>and</strong> a mill site layout is shown inFigure 18.2.Project facilities <strong>and</strong> infrastructure at the Brucejack site will include:• an upgraded 79 km access road at Highway 37 <strong>and</strong> travelling westward toBrucejack Lake with the last 12 km of access road to the mine site traversingthe main arm of the Knipple Glacier• a 138 kV power supply line from the substation at Long Lake Hydro Substationto the Brucejack site substation• site roads <strong>and</strong> pads• water management infrastructure, including diversion ditches for both contact<strong>and</strong> non-contact water, interceptor ditches, <strong>and</strong> water storage ponds <strong>and</strong> pumpsto direct water to a water treatment plant• water treatment infrastructure, to treat underground infill water to a watertreatment plant to treat <strong>and</strong> distribute process <strong>and</strong> fire water• potable water <strong>and</strong> sewage treatment infrastructure• waste management systems, including sewage disposal <strong>and</strong> domestic wastedisposal• ancillary facilities including: on site fuel storage on site explosive storage detonator magazine storage temporary <strong>and</strong> permanent camp accommodations with recreation area,commissary <strong>and</strong> laundry facilities heli-pad laydown areaPretium Resources Inc. 18-1 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!