13.07.2015 Views

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

Feasibility Study and Technical Report - Pretivm

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

28.12 MAUREEN MCGUINNESS, P.ENG.I, Maureen McGuinness, P.Eng., of Sudbury, Ontario, do hereby certify:• I am a Senior Process Engineer with Paterson & Cooke Canada Inc. with a businessaddress at 1351-C Kelly Lake Road, Unit #2, Sudbury, Ontario, P3E 5P5.• This certificate applies to the technical report entitled <strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong><strong>Report</strong> on the Brucejack Project, Stewart, BC, dated June 21, 2013 (the “<strong>Technical</strong><strong>Report</strong>”).• I am a graduate of McGill University (Bachelors of Engineering (Metallurgical), 1995). Iam a member in good st<strong>and</strong>ing of the Professional Engineers Ontario, License#100088420 <strong>and</strong> with l’Ordre des ingenieurs du Québec, License #117139. Myrelevant experience is 10 years as a metallurgical engineer for Xstrata with experiencein commissioning, system expansion <strong>and</strong> operation of pastefill plants. I am a “QualifiedPerson” for the purposes of National Instrument 43-101 (the “Instrument”).• I did not complete a personal inspection of the Property.• I am responsible for Sections 16.10 <strong>and</strong> 28.12 of the <strong>Technical</strong> <strong>Report</strong>.• I am independent of Pretium Resources Inc. as defined by Section 1.5 of theInstrument.• I have no prior involvement with the Property that is the subject of the <strong>Technical</strong> <strong>Report</strong>.• I have read the Instrument <strong>and</strong> the sections of the <strong>Technical</strong> <strong>Report</strong> that I amresponsible for has been prepared in compliance with the Instrument.• As of the date of this certificate, to the best of my knowledge, information <strong>and</strong> belief,the sections of the <strong>Technical</strong> <strong>Report</strong> that I am responsible for contains all scientific <strong>and</strong>technical information that is required to be disclosed to make the technical report notmisleading.Signed <strong>and</strong> dated this 25 th day of June, 2013 at Sudbury, OntarioOriginal document signed <strong>and</strong> sealed byMaureen McGuinness, P.Eng.Maureen McGuinness, P.Eng.Senior Process EngineerPaterson & Cooke Canada Inc.Pretium Resources Inc. 28-14 1291990200-REP-R0012-02<strong>Feasibility</strong> <strong>Study</strong> <strong>and</strong> <strong>Technical</strong> <strong>Report</strong> on the BrucejackProject, Stewart, BC

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!